215 N Murdeaux Ln
Dallas, TX 75217
Gas test permit filed at 215 N Murdeaux Ln
A City of Dallas residential plumbing permit for a gas test was filed at 215 N Murdeaux Ln on June 27, 2026. The records do not indicate new construction or a larger project.
Summarized from City of Dallas records · updated Jun 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jun 27, 2026
- since Jun 27, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 215 N Murdeaux Ln
What is happening at 215 N Murdeaux Ln?
A City of Dallas residential plumbing permit describes a gas test. It was filed June 27, 2026, under permit RES-PLM-26-006634.
Is a new home being built at 215 N Murdeaux Ln?
The available records do not indicate new home construction. The latest permit is for a gas test.
When was the gas test permit filed?
The City of Dallas filed permit RES-PLM-26-006634 on June 27, 2026.
What kind of permit was issued for 215 N Murdeaux Ln?
It is a residential plumbing permit, described as a gas test. The record does not list a project value or square footage.
Have there been earlier permits at this address?
Yes. A City of Dallas plumbing permit dated August 30, 2019, also described a gas test. Its permit number is 1908303052.
Also being built nearby
All of 75217- 222 N Murdeaux LnOct 9, 2025Need gas test to release service per atmos energy · 17 m away
- 315 N Murdeaux LnJul 15, 2026Replace 1- 50 gallon gas water heater incloset · 144 m away
- 207 Greenhaven DrFeb 13, 2026Pressure test · 155 m away
- 238 Greenhaven DrAug 30, 2026Water heater replacement · 158 m away
- 226 Greenhaven DrMay 12, 2025Gas test · 160 m away
- 111 N Murdeaux LnDec 8, 2025Traffic signal installation along loop 12 · 179 m away
- 7506 Great Trinity Forest WayApr 21, 2026Building new commercial office structure · 276 m away
- 7731 Antoinette StApr 30, 2026-pull required permit for gas line repair-remove and replace existing gas regulator-make necessary gas line repairs-perform pressure test on gas line-schedule and coordinate city inspection-upon passing inspection (green tag), reassemble gas line-coordinate with atmos to restore gas service-purge air from gas line-test and verify both boilers are operating properly · 346 m away
- 125 S Murdeaux LnNov 19, 2026Only replace damaged wire · 357 m away
- 7620 Great Trinity Forest WayOct 9, 2025Service release no work per oncor · 363 m away
- 7651 C F Hawn FwyJul 21, 2026We will remove the existing boiler, provide and replace with (1) new bradford white brute® deluxe 2000 mbh commercial water heater, (2) 200 gallon storage tanks, including new piping, gas, electrical to the boiler, co monitor, and single story vent stack, check for leaks and proper operation, haul off all old equipment and cleaned the work area upon completion · 372 m away
- 103 Longbranch LnDec 15, 2025Electrical service for the city traffic signal at longbranch ln and great trinity forest way · 384 m away