315 N Murdeaux Ln
Dallas, TX 75217
50-gallon gas water heater replacement at 315 N Murdeaux Ln
A residential plumbing permit filed July 15, 2026, calls for replacing one 50-gallon gas water heater in a closet at 315 N Murdeaux Ln. The City of Dallas record is permit RES-PLM-26-007314.
Summarized from City of Dallas records · updated Jul 15, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 15, 2026
- since Jul 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 315 N Murdeaux Ln
What work is planned at 315 N Murdeaux Ln?
A City of Dallas plumbing permit calls for replacing one 50-gallon gas water heater in a closet. The permit was filed July 15, 2026.
Is a new building being built at 315 N Murdeaux Ln?
The available record describes a water heater replacement, not new building construction. It is a residential plumbing permit filed July 15, 2026.
What is permit RES-PLM-26-007314 for?
Permit RES-PLM-26-007314 covers replacement of one 50-gallon gas water heater in a closet at 315 N Murdeaux Ln. It was filed with the City of Dallas on July 15, 2026.
When was the water heater replacement permit filed?
The City of Dallas permit was filed July 15, 2026. The record describes a replacement of one 50-gallon gas water heater.
How many water heaters are being replaced at 315 N Murdeaux Ln?
The permit description specifies one 50-gallon gas water heater. The City of Dallas filed the permit on July 15, 2026.
Also being built nearby
All of 75217- 222 N Murdeaux LnOct 9, 2025Need gas test to release service per atmos energy · 133 m away
- 215 N Murdeaux LnJun 27, 2026Gas test · 144 m away
- 238 Greenhaven DrAug 30, 2026Water heater replacement · 226 m away
- 226 Greenhaven DrMay 12, 2025Gas test · 237 m away
- 207 Greenhaven DrFeb 13, 2026Pressure test · 248 m away
- 7651 C F Hawn FwyJul 21, 2026We will remove the existing boiler, provide and replace with (1) new bradford white brute® deluxe 2000 mbh commercial water heater, (2) 200 gallon storage tanks, including new piping, gas, electrical to the boiler, co monitor, and single story vent stack, check for leaks and proper operation, haul off all old equipment and cleaned the work area upon completion · 323 m away
- 111 N Murdeaux LnDec 8, 2025Traffic signal installation along loop 12 · 323 m away
- 7731 Antoinette StApr 30, 2026-pull required permit for gas line repair-remove and replace existing gas regulator-make necessary gas line repairs-perform pressure test on gas line-schedule and coordinate city inspection-upon passing inspection (green tag), reassemble gas line-coordinate with atmos to restore gas service-purge air from gas line-test and verify both boilers are operating properly · 397 m away
- 7506 Great Trinity Forest WayApr 21, 2026Building new commercial office structure · 419 m away
- 7620 Great Trinity Forest WayOct 9, 2025Service release no work per oncor · 489 m away
- 103 Longbranch LnDec 15, 2025Electrical service for the city traffic signal at longbranch ln and great trinity forest way · 497 m away
- 410 Hillburn DrDec 24, 2025Wooden pallets are stored outdoors in designated areas while awaiting repair or shipping. the pallets are stacked securely in uniform piles, with each stack reaching a maximum height of approximately 17 feet. the storage area is organized to allow safe access for forklifts and personnel, and all stacks are maintained in a stable condition to minimize risk of collapse or fire hazard. the outdoor storage area is monitored regularly to ensure compliance with safety and municipal regulation · 499 m away