243 Bridges St
Dallas, TX 75217
Electrical service equipment replacement at 243 Bridges St
A residential electrical permit covers replacement of the electrical panel, meter base and riser after a tree fell on the service at 243 Bridges St. The City of Dallas permit was filed March 9, 2026; the record does not describe new construction.
Summarized from City of Dallas records · updated Mar 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 9, 2026
- since Mar 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 243 Bridges St
What is being built at 243 Bridges St in Dallas?
The City of Dallas record is for electrical service equipment replacement, not a new building. The work includes a panel, meter base and riser, according to permit RES-ELC-26-001328, filed March 9, 2026.
Was a permit filed for 243 Bridges St?
Yes. The City of Dallas filed residential electrical permit RES-ELC-26-001328 on March 9, 2026.
Why is electrical work being done at 243 Bridges St?
The permit description says a tree fell on the electrical service. It lists replacement of the panel, meter base and riser.
Is a new home being built at 243 Bridges St?
The available record does not indicate new home construction. It describes electrical service equipment replacement under a residential electrical permit.
What is happening near Kleberg Trail Phase 1?
At 243 Bridges St, about 268 meters from Kleberg Trail Phase 1, a City of Dallas permit covers replacement of electrical service equipment. The permit was filed March 9, 2026.
Also being built nearby
All of 75217- 239 Bridges StSep 8, 2026Nsfaa detach garage use for parking · 9 m away
- 234 Bridges StNov 2, 2026Nsfaa scope of work: interior remodel consisting only of adding non?load?bearing partition walls to divide one existing room into a pantry, a closet, and an additional small room. no electrical work, no plumbing work, no mechanical work, and no structural modifications are included. no changes to the exterior or building footprint · 24 m away
- 222 Bridges StMay 20, 2026Installing all plumbing for remodel construction · 51 m away
- 8405 Redkey StJul 8, 2026Repaired gas leak performed gas test · 146 m away
- 8413 Redkey StDec 4, 2020Up grade electrical panel · 147 m away
- 243 Freddie StJul 10, 2025Nsfaa-change entrance door location · 150 m away
- 222 Glenview StMar 2, 2026Removed old shingles and layer felt install new layer felt and shingles · 157 m away
- 216 Glenview StJul 24, 2025Replace roof · 159 m away
- 238 Freddie StMay 7, 2025Gas test · 170 m away
- 205 Glenview StNov 4, 2025Service repair, new weather head and riser wires · 178 m away
- 219 Freddie StMar 31, 2026Installing a 2 ton electric havc system complete with ducts and grill · 214 m away
- 200 Pleasant Drive · Kleberg Trail Phase 1May 6, 2026Kleberg trail phase 1- from dart buckner station to crawford memorial — new construction — approximately 4,800 lf of 12' wide multi use trail · 268 m away