200 Pleasant Drive
Dallas, TX 75217 · Kleberg Trail Phase 1
Kleberg Trail Phase 1: 4,800-foot multiuse trail
A 12-foot-wide, approximately 4,800-foot multiuse trail is planned from DART Buckner Station to Crawford Memorial. The project was registered with the Texas Department of Licensing and Regulation on May 6, 2026.
Summarized from Texas Department of Licensing and Regulation records · updated May 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2026
- since May 6, 2026
- Largest scope
- 51,000 sf
- Estimated cost
- $1.4M
- state registration
Where this project stands
In state plan reviewKleberg Trail Phase 1- From DART Buckner Station to Crawford Memorial
51,000 sq ft · $1.4M est.
- RegisteredMay 6, 2026
- Plan reviewnow
- ConstructionFeb '26 – Dec '26
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectApproximately 4,800 lf of 12' wide multi use trail. — kleberg trail phase 1
TDLR project registrationNew ConstructionProject Registered51,000 sq ft$1.4M est.- Project #
- TABS2026019549
- Tenant / owner
- Kleberg Trail Phase 1- From Dart Buckner Station To Crawford Memorial
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 200 Pleasant Drive
What is being built at 200 Pleasant Drive in Dallas?
A TDLR-registered project for Kleberg Trail Phase 1 describes an approximately 4,800-foot-long, 12-foot-wide multiuse trail. The registration is dated May 6, 2026.
Where will Kleberg Trail Phase 1 run?
The project description says the trail will run from DART Buckner Station to Crawford Memorial.
How wide will the Kleberg Trail be?
The project registration describes a 12-foot-wide multiuse trail.
How long is Kleberg Trail Phase 1?
The TDLR registration describes approximately 4,800 linear feet of trail.
How much is the Kleberg Trail project estimated to cost?
The applicant's TDLR estimate is $1,438,777 for the project.
Has construction started on Kleberg Trail Phase 1?
The TDLR record lists the project as registered, with a registration date of May 6, 2026. It does not state whether construction has started.
Also being built nearby
All of 75217- 202 Pleasant DrJan 9, 2026Gas re pipe 150ft to new location set by atmos energy · 2 m away
- 222 Glenview StMar 2, 2026Removed old shingles and layer felt install new layer felt and shingles · 117 m away
- 216 Glenview StJul 24, 2025Replace roof · 121 m away
- 205 Glenview StNov 4, 2025Service repair, new weather head and riser wires · 121 m away
- 160 Pleasant DrSep 18, 2026New commercial warehouse with office - need to apply for early release and also q-team review · 153 m away
- 320 Pleasant DrMay 8, 2026Nsfaa-adding 4 bedrooms and 1 bathroom · 178 m away
- 342 Pleasant DrJan 22, 2026Removing old shingales adding new shingels · 225 m away
- 355 Pleasant DrAug 21, 2026Gas test · 252 m away
- 243 Bridges StMar 9, 2026Tree fell on with p service. replace with p panel, meterbase and riser · 268 m away
- 239 Bridges StSep 8, 2026Nsfaa detach garage use for parking · 269 m away
- 234 Bridges StNov 2, 2026Nsfaa scope of work: interior remodel consisting only of adding non?load?bearing partition walls to divide one existing room into a pantry, a closet, and an additional small room. no electrical work, no plumbing work, no mechanical work, and no structural modifications are included. no changes to the exterior or building footprint · 283 m away
- 222 Bridges StMay 20, 2026Installing all plumbing for remodel construction · 287 m away