355 Pleasant Dr
Dallas, TX 75217
Residential gas test permit filed at 355 Pleasant Dr
A residential plumbing permit for a gas test at 355 Pleasant Dr was filed on Aug. 21, 2026, according to City of Dallas records. The record does not describe any additional work.
Summarized from City of Dallas records · updated Aug 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 21, 2026
- since Aug 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 355 Pleasant Dr
What is being built at 355 Pleasant Dr?
The City of Dallas record is for a residential gas test permit, not a new building. It does not specify additional work.
When was the permit filed for 355 Pleasant Dr?
The City of Dallas filed residential plumbing permit RES-PLM-26-008865 on Aug. 21, 2026.
Is a new home being built at 355 Pleasant Dr?
The available record does not indicate new home construction. It describes a gas test under a residential plumbing permit.
Does the gas test permit mean a new gas line is being installed?
The permit description says only “Gas test.” It does not specify whether a gas line is being installed or replaced.
What's happening near Kleberg Trail Phase 1 on Pleasant Drive?
A residential gas test permit was filed at 355 Pleasant Dr, about 252 meters from Kleberg Trail Phase 1, according to the records.
Also being built nearby
All of 75217- 342 Pleasant DrJan 22, 2026Removing old shingales adding new shingels · 29 m away
- 320 Pleasant DrMay 8, 2026Nsfaa-adding 4 bedrooms and 1 bathroom · 74 m away
- 432 Pleasant DrApr 7, 2026Electrical for remodel and addition · 169 m away
- 8314 Birch StJul 29, 2026Gas test · 186 m away
- 8322 Birch StOct 2, 2025Replace gas line in kitchen and water heater · 192 m away
- 202 Pleasant DrJan 9, 2026Gas re pipe 150ft to new location set by atmos energy · 249 m away
- 200 Pleasant Drive · Kleberg Trail Phase 1May 6, 2026Kleberg trail phase 1- from dart buckner station to crawford memorial — new construction — approximately 4,800 lf of 12' wide multi use trail · 252 m away
- 415 Bridges StJun 18, 202615ft gas yard line replacement /relocate to new gas meter set by atmos energy · 261 m away
- 222 Glenview StMar 2, 2026Removed old shingles and layer felt install new layer felt and shingles · 311 m away
- 8405 Redkey StJul 8, 2026Repaired gas leak performed gas test · 320 m away
- 216 Glenview StJul 24, 2025Replace roof · 322 m away
- 8413 Redkey StDec 4, 2020Up grade electrical panel · 329 m away