326 Campus Dr
Dallas, TX 75217
326 Campus Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 326 Campus Dr, Dallas, TX 75217. The most recent, filed July 23, 2025, covers: “The existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage”.
Compiled from City of Dallas records · updated Jul 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 23, 2025
- since Jul 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThe existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage
The existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage
City of Dallas permitResidential Drive Approach and Sidewalk Permit
Sources: City of Dallas
Questions about 326 Campus Dr
What is being built at 326 Campus Dr?
The latest filing (City of Dallas permit RES-DSW-25-000263, July 23, 2025) covers the existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage.
How many permits and filings does 326 Campus Dr have?
1 filing across 1 project, from July 23, 2025 to July 23, 2025.
What is being built near Dallas Independent School District in Dallas?
326 Campus Dr is about 131 m from Dallas Independent School District (9733 Old Seagoville Road). Its latest filing is for the existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage.
Is there other construction near 326 Campus Dr?
Yes. Nearby filings include 317 Campus Dr (we are adding a 8 feet 10 inches board on board cedar fence on the back and side of our property, Aug 5, 2026); 343 Campus Dr (service repair and upgrades, Jul 8, 2026); 347 Campus Dr (electrical panel upgrade, Apr 1, 2026).
How do I get alerts for new permits at 326 Campus Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 317 Campus DrAug 5, 2026We are adding a 8 feet 10 inches board on board cedar fence on the back and side of our property · 37 m away
- 343 Campus DrJul 8, 2026Service repair and upgrades · 57 m away
- 347 Campus DrApr 1, 2026Electrical panel upgrade · 70 m away
- 353 Campus DrJul 10, 2026Replace 3 ton complete gas system · 91 m away
- 9733 Old Seagoville RdSep 14, 2026Building h auto shop 2409241140_188846354-006 hvac · 131 m away
- 9733 Old Seagoville Road · Dallas Independent School DistrictJan 30, 2024H. grady spruce high school additions & renovations — additions to existing building — athletic and resource center additions totaling 41,134 sq ft renovations and remodeling of existing school including partial facade replacement, light fixtures, flooring replacement, etc · 131 m away
- 9815 Caravelle CtAug 27, 2026Installation of a 13.500 kwh battery and a 225a service upgrade · 133 m away
- 361 Crenshaw DrJul 7, 2026Mcr with battery 15.580 kw dc roof mountsolar pv system with38 american made power solution:amps-410p-54bb 410w pv modules with19 duracell: d600-m2a-240amicroinverters01 duracell power center maxhybrid 15 inverter08 duracell dura5 dc-coupledbatteries [40 kwh] · 174 m away
- 9815 Schooner CtSep 16, 2020Upgrade existing electrical service · 192 m away
- 350 Legacy DrMay 27, 2026Mcr- 3rd party review installation of a 23 modules - roofmounted - 10.120 kw dc, 7.600 kw ac · 211 m away
- 358 Legacy DrNov 5, 2026Installation of a 1 tesla powerwall 3 battery addition - 13.500 kwh capacity · 230 m away
- 9622 Old Seagoville Rd · La PrenzaAug 4, 2026Construct new commercial buildingconvenience store · 237 m away