343 Campus Dr
Dallas, TX 75217
Home repairs and an EV charger permitted at 343 Campus Dr
City of Dallas permits at 343 Campus Dr cover residential electrical work, a Level 2 EV charger, and a gas-line replacement; the records do not describe a new building. The filings were dated May 20, 2025, April 2, 2026, and July 8, 2026.
Summarized from City of Dallas records · updated Jul 8, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 8, 2026
- since May 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsLevel 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <20 feet new 3?4” emt conduit to power the level 2 ev charger at 48amp constant draw
Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u.ground through <20 feet new 3?4” emt conduit to power the level 2 ev charger at 48amp constant draw
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 343 Campus Dr
What is being built at 343 Campus Dr in Dallas?
The City of Dallas records describe home electrical work, a Level 2 EV charger, and a gas-line replacement, not a new building. The filings date from May 2025 to July 2026.
Is a new home being built at 343 Campus Dr?
The records provided do not show a new-home construction permit. They list residential electrical and plumbing work.
Is an EV charger being installed at 343 Campus Dr?
Yes. Permit RES-ELC-26-001883, filed April 2, 2026, describes a Level 2 EV charger powered by a 60-amp circuit.
What electrical work is permitted at 343 Campus Dr?
The City of Dallas filed permit RES-ELC-26-003986 on July 8, 2026, for service repair and upgrades. An earlier electrical permit covers a Level 2 EV charger.
Was a gas line replaced at 343 Campus Dr?
A residential plumbing permit filed May 20, 2025, describes gas-line replacement under a pier-and-beam house. The permit number is RES-PLM-25-000481.
Also being built nearby
All of 75217- 347 Campus DrApr 1, 2026Electrical panel upgrade · 14 m away
- 353 Campus DrJul 10, 2026Replace 3 ton complete gas system · 34 m away
- 326 Campus DrJul 23, 2025The existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage · 57 m away
- 317 Campus DrAug 5, 2026We are adding a 8 feet 10 inches board on board cedar fence on the back and side of our property · 89 m away
- 9815 Caravelle CtAug 27, 2026Installation of a 13.500 kwh battery and a 225a service upgrade · 126 m away
- 361 Crenshaw DrJul 7, 2026Mcr with battery 15.580 kw dc roof mountsolar pv system with38 american made power solution:amps-410p-54bb 410w pv modules with19 duracell: d600-m2a-240amicroinverters01 duracell power center maxhybrid 15 inverter08 duracell dura5 dc-coupledbatteries [40 kwh] · 131 m away
- 9815 Schooner CtSep 16, 2020Upgrade existing electrical service · 161 m away
- 9733 Old Seagoville RdSep 14, 2026Building h auto shop 2409241140_188846354-006 hvac · 172 m away
- 9733 Old Seagoville Road · Dallas Independent School DistrictJan 30, 2024H. grady spruce high school additions & renovations — additions to existing building — athletic and resource center additions totaling 41,134 sq ft renovations and remodeling of existing school including partial facade replacement, light fixtures, flooring replacement, etc · 172 m away
- 350 Legacy DrMay 27, 2026Mcr- 3rd party review installation of a 23 modules - roofmounted - 10.120 kw dc, 7.600 kw ac · 195 m away
- 9726 Cushing DrMay 23, 2025Gas test · 206 m away
- 358 Legacy DrNov 5, 2026Installation of a 1 tesla powerwall 3 battery addition - 13.500 kwh capacity · 208 m away