9726 Cushing Dr
Dallas, TX 75217
9726 Cushing Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 9726 Cushing Dr, Dallas, TX 75217. The most recent, filed May 23, 2025, covers: “Gas test”.
Compiled from City of Dallas records · updated May 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 23, 2025
- since May 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9726 Cushing Dr
What is being built at 9726 Cushing Dr?
The latest filing (City of Dallas permit RES-PLM-25-000752, May 23, 2025) covers gas test.
How many permits and filings does 9726 Cushing Dr have?
1 filing across 1 project, from May 23, 2025 to May 23, 2025.
Is there other construction near 9726 Cushing Dr?
Yes. Nearby filings include 9815 Schooner Ct (upgrade existing electrical service, Sep 16, 2020); 353 Campus Dr (replace 3 ton complete gas system, Jul 10, 2026); 9904 Cushing Dr (200 amp panel and meter base replacement, Dec 10, 2025).
How do I get alerts for new permits at 9726 Cushing Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75217- 9815 Schooner CtSep 16, 2020Upgrade existing electrical service · 155 m away
- 353 Campus DrJul 10, 2026Replace 3 ton complete gas system · 172 m away
- 9904 Cushing DrDec 10, 2025200 amp panel and meter base replacement · 179 m away
- 361 Crenshaw DrJul 7, 2026Mcr with battery 15.580 kw dc roof mountsolar pv system with38 american made power solution:amps-410p-54bb 410w pv modules with19 duracell: d600-m2a-240amicroinverters01 duracell power center maxhybrid 15 inverter08 duracell dura5 dc-coupledbatteries [40 kwh] · 191 m away
- 347 Campus DrApr 1, 2026Electrical panel upgrade · 192 m away
- 358 Legacy DrNov 5, 2026Installation of a 1 tesla powerwall 3 battery addition - 13.500 kwh capacity · 201 m away
- 343 Campus DrJul 8, 2026Service repair and upgrades · 206 m away
- 350 Legacy DrMay 27, 2026Mcr- 3rd party review installation of a 23 modules - roofmounted - 10.120 kw dc, 7.600 kw ac · 218 m away
- 9815 Caravelle CtAug 27, 2026Installation of a 13.500 kwh battery and a 225a service upgrade · 222 m away
- 505 Bayshore PlSep 8, 2025Replace existing hvac system · 241 m away
- 431 S St Augustine RdSep 25, 2026Reroof · 253 m away
- 326 Campus DrJul 23, 2025The existing approach and sidewalk will be removed and replaced. the new approach will be widened to 30 feet in width by 18 feet in length, with 5-foot radius returns on each side. all work will be completed in accordance with applicable city specifications and construction standards. proper grading and reinforcement will be ensured to maintain durability and proper drainage · 261 m away