641 Haverhill Ln
Dallas, TX 75217
Gas repair and test permitted at 641 Haverhill Ln
A residential plumbing permit records gas repair and testing at 641 Haverhill Ln. The City of Dallas filed the permit on June 3, 2026; the record does not specify the scope of the repair.
Summarized from City of Dallas records · updated Jun 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2026
- since Jun 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 641 Haverhill Ln
What is being built at 641 Haverhill Ln?
The City of Dallas permit record describes gas repair and testing, not new construction. The residential plumbing permit was filed June 3, 2026.
What work was permitted at 641 Haverhill Ln in Dallas?
The permit describes gas repair and test. It is listed as permit RES-PLM-26-005693, filed June 3, 2026.
When was the gas repair permit filed at 641 Haverhill Ln?
The City of Dallas filed permit RES-PLM-26-005693 on June 3, 2026.
Is a new home being built at 641 Haverhill Ln?
The available record does not describe new construction. It lists a residential plumbing permit for gas repair and testing.
What is happening near the Dallas County Mental Health & Mental Retardation Center?
At 641 Haverhill Ln, about 301 meters from the center at 9209 Elam Road, a City of Dallas permit records gas repair and testing. The permit was filed June 3, 2026.
Also being built nearby
All of 75217- 709 Southgate LnAug 14, 2026New plumbing · 244 m away
- 446 N Prairie Creek RdNov 18, 2026Gas test · 253 m away
- 9227 Marvel DrMar 2, 2026Re-roof · 258 m away
- 608 Blueberry BlvdJan 6, 2026Whole house gas test to restore service · 286 m away
- 536 Blueberry BlvdJul 14, 2026Gas test · 288 m away
- 9209 Elam Road · Dallas County Mental Health & Mental Retardation CenterJun 30, 2026Harbor of hope — new construction — new construction, 41-unit permanent supportive multifamily housing with associated common spaces and parking. total of 55,561 sq ft · 301 m away
- 9209 Elam RdJul 10, 2026Qteam meeting 8.18.26 (9 am) - 3-story, type v-a new construction, 41 units permanent supportive housing multifamily., with associated surface parking · 301 m away
- 9202 Elam RdAug 10, 2026Install new 2" domestic water line from building to garden area · 310 m away
- 9217 Elam RdNov 10, 2026The scope of work consists of reusing the existing 14'-0" x 16'-0" concrete pad and extending it to 14'-0" x 22'-0". the project includes the installation of one 12'-0" h-frame, two span panels, four tesla powerwall 3 units, two tesla gateway 3 units, one charles fiber box (cube-m01818wb-a), one 200a meter in the existing meter box, one new single meter box on the existing utility h-frame, one 200a meter in the proposed meter box, four nodes, and one ground bar. additional work includes installing conduit runs from the h-frame to the nodes and installing fiber handholes, with the final quantity of handholes to be determined by the contractor · 315 m away
- 8766 Odom DrDec 1, 2025Gas air test for meter release · 347 m away
- 750 Southgate LnDec 3, 2025Gas test · 359 m away
- 620 Cedarcliff DrJan 29, 2026Removing drive approach of 9x12'replacing with a double wide approach 21x9'removing and replacing driveway section of 8x40 · 363 m away