Reinhardt Elementary renovation and site work in Dallas

Permits indicate renovation and site work at Reinhardt Elementary, including parking and sidewalk work, an administration-area renovation, an accessibility ramp, a canopy, and building-system upgrades. The first related permits in this record were filed April 24, 2026; additional electrical and plumbing permits followed through October 3, 2026.

Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated Oct 3, 2026

Projects
7
7 filings
Latest filing
Oct 3, 2026
since Dec 17, 2024
Largest scope
2,058 sf
Estimated cost
$4.6M
state registration

Permit & project history

7 projects
  1. 1. underground & rough in- grease interceptor installation schier gb-500/gb-250, undergrouns sanitary & watepiping crawlspace2. above ground dwv/pressure- water domestic hot & cold, dwv 3. fixture & equipment final- plumbing fixtures, water heating & gas equipment

    1. underground & rough in- grease interceptor installation schier gb-500/gb-250, undergrouns sanitary & watepiping crawlspace2. above ground dwv/pressure- water domestic hot & cold, dwv 3. fixture & equipment final- plumbing fixtures, water heating & gas equipment

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-26-003876
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Dsst-disd reinhardt elementary: site work and canopy shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    Dsst-disd reinhardt elementary: site work and canopy shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-004072
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior electrical remodel of the existing building

    Interior electrical remodel of the existing building

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-26-003296
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Dsst-disd reinhardt elementary interior renovation to an existing school, disd reinhardt elementary. vestibule and administration renovation with new ada accessibility ramp at entry. portion of existing sidewalk to be replaced with new concrete. skills room. existing grease trap to be replaced with a new grease trap. 1 for 1 hvac upgrades

    Dsst-disd reinhardt elementary interior renovation to an existing school, disd reinhardt elementary. vestibule and administration renovation with new ada accessibility ramp at entry. portion of existing sidewalk to be replaced with new concrete. skills room. existing grease trap to be replaced with a new grease trap. 1 for 1 hvac upgrades

    City of Dallas permitCommercial Alteration Addition Permit
    Record
    COM-ALT-ADD-25-001471
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Dsst-disd reinhardt elementary: interior reno shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    Dsst-disd reinhardt elementary: interior reno shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000179
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Dsst-disd reinhardt elementary: site work and canopy shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    Dsst-disd reinhardt elementary: site work and canopy shall begin fall of 2025 depending on permitting. phase 1 will include portions of sidewalk and parking paving, fire alarm infrastructure, minor hvac exhaust fan and condensing unit replacements. phase 2 will begin summer 2026; phase 2 will include the interior administration renovation, exterior ada ramp, rooftop unit replacements, new exterior canopy, electrical switchgear replacement

    City of Dallas permitPhase - Alteration Addition
    Record
    COM-PH-ALT-ADD-26-000178
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Scope of work consist of primarily renovations of the existing building, front vestibule, and some site improvements. 62,324 sq ft, area of renovations: 2,058 sq ft — reinhardt elementary school

    TDLR project registrationRenovation/AlterationReview Complete2,058 sq ft$4.6M est.
    Tenant / owner
    Reinhardt Elementary School Renovations
    Design firm
    Pro
    Contact
    Pro

Sources: City of Dallas · Texas Department of Licensing and Regulation

Questions about 10122 Losa Dr

What is being built at 10122 Losa Dr in Dallas?

City of Dallas permits describe renovation and site work at Reinhardt Elementary, an existing school. The work includes parking and sidewalk paving, interior renovations, an accessibility ramp, a canopy, and HVAC and electrical upgrades.

Is Reinhardt Elementary getting a new building?

The permits describe renovations to an existing school, not a new building. The listed work includes changes to the administration area and site improvements.

When were permits filed for the Reinhardt Elementary renovation?

The first related permits in this record were filed April 24, 2026. Later electrical and plumbing permits were filed July 21, August 24, and October 3, 2026.

Will parking at Reinhardt Elementary be changed?

The permit descriptions include portions of parking paving and sidewalk work as part of the site improvements. They do not specify the number of spaces affected.

What renovations are planned inside Reinhardt Elementary?

The permits describe an interior administration renovation and a skills room, along with HVAC upgrades. A July 21, 2026 electrical permit also describes an interior electrical remodel.

What does the plumbing permit cover at 10122 Losa Dr?

Permit COM-PLM-26-003876, filed October 3, 2026, describes grease-interceptor installation, water and sanitary piping, and plumbing fixtures and equipment.