1516 Fuller Dr
Dallas, TX 75218
New 100-amp electrical panel and service permitted in Dallas
A City of Dallas permit filed November 11, 2026, covers installation of a new 100-amp panel and 120/240-volt service at 1516 Fuller Dr. The record does not specify other construction or a project cost.
Summarized from City of Dallas records · updated Nov 11, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2026
- since Nov 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 1516 Fuller Dr
What is being built at 1516 Fuller Dr in Dallas?
A City of Dallas commercial electrical permit covers installation of a new 100-amp panel and 120/240-volt service. The permit was filed November 11, 2026.
What work is the permit for at 1516 Fuller Dr?
Permit COM-ELC-26-005576 is for installing a new 100-amp panel and 120/240-volt service.
When was the electrical permit filed for 1516 Fuller Dr?
The City of Dallas permit was filed on November 11, 2026.
Is a new business opening at 1516 Fuller Dr?
The available permit record describes electrical work only and does not identify a business or tenant.
How much will the work at 1516 Fuller Dr cost?
The permit record does not report a project cost.
Also being built nearby
All of 75218- 10430 Hermosa DrNov 18, 2026Gas test, service release, no work · 116 m away
- 10436 Hermosa DrOct 30, 2026Gas test · 116 m away
- 10302 Hermosa DrNov 11, 2026Install new 100 amp panel, 120/240 volt service · 118 m away
- 10304 E Zacha DrAug 20, 2026Clean and show//temporary service · 155 m away
- 1418 Fuller DrFeb 18, 2026Wiring home addition, plugs and lights · 156 m away
- 1408 Fuller DrNov 9, 2026Tear off existing shingles and replacing roof with architectural shingles · 173 m away
- 1422 Moran DrJul 18, 2026Remove shingles and underlaymentinstall new shingles and underlayment · 183 m away
- 1409 Moran DrOct 19, 2026Gas test needed to restore gas serviceline repaired under the home · 197 m away
- 10407 Wood Dale DrSep 25, 2026Repair gas leak and gas test · 209 m away
- 1439 Casa Vale DrOct 1, 2026Erie to remove existing roofing and properly dispose. erie to furnish and installice and water shield where applicable.erie to furnish and install fiberglass dimensional shingle.erie to furnish and install all accessories that may include drip edge, pipe boots,and flashing.erie to vent roof properly.erie to furnish and install premium synthetic underlayment · 215 m away
- 10122 Losa Dr · Dallas ISDOct 3, 20261. underground & rough in- grease interceptor installation schier gb-500/gb-250, undergrouns sanitary & watepiping crawlspace2. above ground dwv/pressure- water domestic hot & cold, dwv 3. fixture & equipment final- plumbing fixtures, water heating & gas equipment · 217 m away
- 1433 Casa Vale DrJan 2, 2026Replacing kitchen and laundry sewer/ drain lines · 218 m away