10409 Clary Dr
Dallas, TX 75218
10409 Clary Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 10409 Clary Dr, Dallas, TX 75218 since January 20, 2021. The most recent, filed January 22, 2021, covers: “Electrical remodel”.
Compiled from City of Dallas records · updated Jan 22, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 22, 2021
- since Jan 20, 2021
- Largest scope
- —
- Listed value
- $7
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 10409 Clary Dr
What is being built at 10409 Clary Dr?
The latest filing (City of Dallas permit 2101223009, January 22, 2021) covers electrical remodel.
How many permits and filings does 10409 Clary Dr have?
2 filings across 2 projects, from January 20, 2021 to January 22, 2021.
How much is the construction at 10409 Clary Dr worth?
Permits at this address list about $7 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Lullwater Retail, in Dallas?
10409 Clary Dr is about 167 m from Lullwater Retail, (10409 E NW Hwy). Its latest filing is for electrical remodel.
Is there other construction near 10409 Clary Dr?
Yes. Nearby filings include 10415 Clary Dr (replace 50 gallon gas water heater in laundry room, Sep 23, 2026); 10560 Solta Dr (install water heater, Dec 7, 2020); 10518 Solta Dr (upgrade existing electrical service, Oct 2, 2020).
How do I get alerts for new permits at 10409 Clary Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 10415 Clary DrSep 23, 2026Replace 50 gallon gas water heater in laundry room · 26 m away
- 10560 Solta DrDec 7, 2020Install water heater · 38 m away
- 10518 Solta DrOct 2, 2020Upgrade existing electrical service · 99 m away
- 131 Bon Aire DrFeb 27, 2026Remove old composition shingles & install new composition shingles · 119 m away
- 10410 E Northwest HwyFeb 27, 2026Mcr basement moisture intrusion mitigation based on engineer’s report.includes excavation, hdpe waterproofing on cmu walls, drainage improvements, and foundation waterproofing repairs per engineered diagrams · 121 m away
- 155 Bon Aire DrOct 6, 2026Replace building under house under pier and beam repair sewer in yard · 148 m away
- 10175 Baronne CirOct 2, 2025Replace 3 ton gas hvac unit · 153 m away
- 10435 E Northwest HwyMay 29, 20268.19.2025 - 9 am - one- story wood framed child learning center. flat roof, wood framed exterior bearing walls, and cmu/concrete foundations. this includes a full interior finish package, playground equipment and fencing · 153 m away
- 10425 E Northwest HwyAug 5, 2026Electrical finish out of a new sherwin williams paint store · 158 m away
- 169 Bon Aire DrFeb 24, 2026Replace federal pacific panel and install a 200-amp meter base and electrical panel · 166 m away
- 10409 E NW Hwy · Lullwater Retail, LPJul 22, 2026Sherwin williams finish out — renovation/alteration — tenant finish out of existing lease space · 167 m away
- 10409 E Northwest Hwy · Connected Acquisition Services, LLCJun 26, 2025Lullwater retail — new construction — new retail shell building · 167 m away