10560 Solta Dr
Dallas, TX 75218
10560 Solta Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 10560 Solta Dr, Dallas, TX 75218. The most recent, filed December 7, 2020, covers: “Install water heater”.
Compiled from City of Dallas records · updated Dec 7, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 7, 2020
- since Dec 7, 2020
- Largest scope
- —
- Listed value
- $975
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 10560 Solta Dr
What is being built at 10560 Solta Dr?
The latest filing (City of Dallas permit 2012073030, December 7, 2020) covers install water heater.
How many permits and filings does 10560 Solta Dr have?
1 filing across 1 project, from December 7, 2020 to December 7, 2020.
How much is the construction at 10560 Solta Dr worth?
Permits at this address list about $975 in valuations. Permit valuations are often partial and understate total project cost.
What is being built near Lullwater Retail, in Dallas?
10560 Solta Dr is about 144 m from Lullwater Retail, (10409 E NW Hwy). Its latest filing is for install water heater.
Is there other construction near 10560 Solta Dr?
Yes. Nearby filings include 10409 Clary Dr (electrical remodel, Jan 22, 2021); 10415 Clary Dr (replace 50 gallon gas water heater in laundry room, Sep 23, 2026); 10518 Solta Dr (upgrade existing electrical service, Oct 2, 2020).
How do I get alerts for new permits at 10560 Solta Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 10409 Clary DrJan 22, 2021Electrical remodel · 38 m away
- 10415 Clary DrSep 23, 2026Replace 50 gallon gas water heater in laundry room · 64 m away
- 10518 Solta DrOct 2, 2020Upgrade existing electrical service · 116 m away
- 10175 Baronne CirOct 2, 2025Replace 3 ton gas hvac unit · 127 m away
- 10410 E Northwest HwyFeb 27, 2026Mcr basement moisture intrusion mitigation based on engineer’s report.includes excavation, hdpe waterproofing on cmu walls, drainage improvements, and foundation waterproofing repairs per engineered diagrams · 133 m away
- 10435 E Northwest HwyMay 29, 20268.19.2025 - 9 am - one- story wood framed child learning center. flat roof, wood framed exterior bearing walls, and cmu/concrete foundations. this includes a full interior finish package, playground equipment and fencing · 138 m away
- 10425 E Northwest HwyAug 5, 2026Electrical finish out of a new sherwin williams paint store · 139 m away
- 10409 E NW Hwy · Lullwater Retail, LPJul 22, 2026Sherwin williams finish out — renovation/alteration — tenant finish out of existing lease space · 144 m away
- 10409 E Northwest Hwy · Connected Acquisition Services, LLCJun 26, 2025Lullwater retail — new construction — new retail shell building · 144 m away
- 10405 E Northwest Hwy · Radical Play 1, LPMar 12, 2026Stonethrow family club — renovation/alteration — adaptive reuse of a 3-story concrete framed building [48,480 sq ft of renovation] and a 1,400 sq ft outdoor pavilion. program includes restaurant, fitness rooms, lounge, bar, and kids play · 145 m away
- 131 Bon Aire DrFeb 27, 2026Remove old composition shingles & install new composition shingles · 155 m away
- 155 Bon Aire DrOct 6, 2026Replace building under house under pier and beam repair sewer in yard · 181 m away