534 Peavy Rd
Dallas, TX 75218
534 Peavy Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 534 Peavy Rd, Dallas, TX 75218. The most recent, filed July 2, 2025, covers: “Installed one 40 gallon gas water heater half in attic half in closet”.
Compiled from City of Dallas records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 534 Peavy Rd
What is being built at 534 Peavy Rd?
The latest filing (City of Dallas permit RES-PLM-25-002079, July 2, 2025) covers installed one 40 gallon gas water heater half in attic half in closet.
How many permits and filings does 534 Peavy Rd have?
1 filing across 1 project, from July 2, 2025 to July 2, 2025.
Is there other construction near 534 Peavy Rd?
Yes. Nearby filings include 525 Peavy Rd (replace or modify existing hvac, Dec 7, 2020); 507 Northlake Dr (nsfaa-remove (4) existing windows, (1) existing door in rear den; replace header and reframe opening; install triple sliding door into new opening, Jul 26, 2025); 414 Edgelake Dr (gas test to set gas meter, Nov 6, 2025).
How do I get alerts for new permits at 534 Peavy Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 525 Peavy RdDec 7, 2020Replace or modify existing hvac · 41 m away
- 507 Northlake DrJul 26, 2025Nsfaa-remove (4) existing windows, (1) existing door in rear den; replace header and reframe opening; install triple sliding door into new opening · 69 m away
- 414 Edgelake DrNov 6, 2025Gas test to set gas meter · 77 m away
- 543 Aqua DrNov 1, 2026Install hvac · 91 m away
- 440 Edge Lake DrSep 8, 2025Mcr install a 8.075 kw roof mounted pv solar system - 19 panels · 95 m away
- 547 Aqua DrApr 8, 2026Tankless install/ gas upgrade · 99 m away
- 515 Aqua DrSep 9, 2025Nsfaa-back patio cover that also functions as a walk-out deck, accessible from the 2nd floor · 111 m away
- 567 Peavy RdAug 18, 2025Install six (6) concrete pilings and reshim understructure to stabilize foundation · 115 m away
- 559 Aqua DrJun 2, 2026Repair would include tunneling approximately 10 feet to expose the damaged main sewer line where the deteriorated cast-iron piping will be removed and replaced with schedule 40 pvc piping installed to current plumbing code requirements · 121 m away
- 514 Aqua DrDec 7, 2025Electrical wiring for new house · 121 m away
- 558 Aqua DrMar 26, 2026Plumbing for addition · 130 m away
- 531 Northlake DrOct 16, 2020Plumbing (pl) single family alteration · 130 m away