567 Peavy Rd
Dallas, TX 75218
567 Peavy Rd: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 567 Peavy Rd, Dallas, TX 75218 since August 14, 2025. The most recent, filed August 18, 2025, covers: “Install six (6) concrete pilings and reshim understructure to stabilize foundation”.
Compiled from City of Dallas records · updated Aug 18, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2025
- since Aug 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 567 Peavy Rd
What is being built at 567 Peavy Rd?
The latest filing (City of Dallas permit RES-FDN-25-000352, August 18, 2025) covers install six (6) concrete pilings and reshim understructure to stabilize foundation.
How many permits and filings does 567 Peavy Rd have?
2 filings across 2 projects, from August 14, 2025 to August 18, 2025.
Is there other construction near 567 Peavy Rd?
Yes. Nearby filings include 507 Northlake Dr (nsfaa-remove (4) existing windows, (1) existing door in rear den; replace header and reframe opening; install triple sliding door into new opening, Jul 26, 2025); 531 Northlake Dr (plumbing (pl) single family alteration, Oct 16, 2020); 560 Northlake Dr (reset/reshim of 677sqft, Sep 2, 2026).
How do I get alerts for new permits at 567 Peavy Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 507 Northlake DrJul 26, 2025Nsfaa-remove (4) existing windows, (1) existing door in rear den; replace header and reframe opening; install triple sliding door into new opening · 55 m away
- 531 Northlake DrOct 16, 2020Plumbing (pl) single family alteration · 82 m away
- 560 Northlake DrSep 2, 2026Reset/reshim of 677sqft · 86 m away
- 607 Harter RdMar 3, 2026The main system and the garage's upper floor system will be replaced, a new copper line will be installed, and the main system ducts will be replaced · 98 m away
- 559 Aqua DrJun 2, 2026Repair would include tunneling approximately 10 feet to expose the damaged main sewer line where the deteriorated cast-iron piping will be removed and replaced with schedule 40 pvc piping installed to current plumbing code requirements · 98 m away
- 609 Aqua DrJan 22, 2026Tankless wh install · 110 m away
- 558 Aqua DrMar 26, 2026Plumbing for addition · 110 m away
- 547 Aqua DrApr 8, 2026Tankless install/ gas upgrade · 112 m away
- 613 Aqua DrOct 22, 2020Install water heater · 113 m away
- 610 Peavy RdOct 28, 2020Electrical repairs · 114 m away
- 534 Peavy RdJul 2, 2025Installed one 40 gallon gas water heater half in attic half in closet · 115 m away
- 543 Aqua DrNov 1, 2026Install hvac · 121 m away