631 Peavy Rd
Dallas, TX 75218
Gas line yard replacement permitted at 631 Peavy Rd
A residential gas line yard replacement was permitted at 631 Peavy Rd on July 21, 2026. The City of Dallas record describes the work as a residential plumbing permit (RES-PLM-26-007541).
Summarized from City of Dallas records · updated Jul 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 21, 2026
- since Jul 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 631 Peavy Rd
What is being built at 631 Peavy Rd?
The City of Dallas permit describes a gas line yard replacement at the residential property. It does not describe a new building.
When was the gas line work at 631 Peavy Rd permitted?
The permit was filed on July 21, 2026. Its number is RES-PLM-26-007541.
What is permit RES-PLM-26-007541 for?
It is a City of Dallas residential plumbing permit for a gas line yard replacement at 631 Peavy Rd.
How much will the work at 631 Peavy Rd cost?
The permit record does not provide a project cost or reported valuation.
What work is permitted near Dallas ISD at 631 Peavy Rd?
A gas line yard replacement was permitted at 631 Peavy Rd, about 122 meters from the Dallas ISD location listed at 9720 Waterview Rd.
Also being built nearby
All of 75218- 655 Peavy RdOct 16, 2026Install 1 50 gal gas water heater in garage also installing stage 3 home water filtration · 46 m away
- 652 Harter RdJul 29, 2026290' of up to 9' tall cedar fence with 3 pedestrian walk gates · 92 m away
- 620 Peavy RdNov 19, 2025Replacing one 4 ton system · 92 m away
- 620 Harter RdAug 7, 2026620 harter install 10 concrete pilings to stabilize foundation · 100 m away
- 643 Harter RdAug 5, 2026Repair leak on gas riser near exterior wall · 102 m away
- 610 Peavy RdOct 28, 2020Electrical repairs · 102 m away
- 649 Harter RdJun 23, 2025Replace 3ton base upflow gas system · 103 m away
- 669 Harter RdOct 29, 2026New plumbing install · 118 m away
- 607 Harter RdMar 3, 2026The main system and the garage's upper floor system will be replaced, a new copper line will be installed, and the main system ducts will be replaced · 122 m away
- 9720 Waterview Rd · Dallas ISDSep 2, 2026Victor h hexter elementary school — new construction — second phase of replacement school consisting of site improvements · 122 m away
- 624 Northlake DrJun 10, 2025New hvac , ducts, and system 4 ton system · 175 m away
- 618 Aqua DrOct 27, 20252.5 ton hvac deluxe furnace · 178 m away