655 Peavy Rd
Dallas, TX 75218
Water heater and filtration permit at 655 Peavy Road
A City of Dallas residential plumbing permit covers installation of a 50-gallon gas water heater in the garage and a Stage 3 home water filtration system at 655 Peavy Road. The permit was filed October 16, 2026.
Summarized from City of Dallas records · updated Oct 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 16, 2026
- since Oct 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 655 Peavy Rd
What is being installed at 655 Peavy Road?
A City of Dallas plumbing permit covers a 50-gallon gas water heater in the garage and a Stage 3 home water filtration system.
When was the plumbing permit filed for 655 Peavy Road?
The permit was filed October 16, 2026. Its number is RES-PLM-26-011076.
Is a new home being built at 655 Peavy Road?
The record is for residential plumbing work, not a new-home construction permit. It covers a water heater and home water filtration installation.
What is being installed near Victor H. Hexter Elementary School?
At 655 Peavy Road, about 130 meters from Victor H. Hexter Elementary School, a permit covers a gas water heater and Stage 3 home water filtration system.
What does permit RES-PLM-26-011076 cover?
The City of Dallas permit covers installation of one 50-gallon gas water heater in the garage and a Stage 3 home water filtration system at 655 Peavy Road.
Also being built nearby
All of 75218- 631 Peavy RdJul 21, 2026Gas line yard replacement · 46 m away
- 652 Harter RdJul 29, 2026290' of up to 9' tall cedar fence with 3 pedestrian walk gates · 96 m away
- 669 Harter RdOct 29, 2026New plumbing install · 104 m away
- 649 Harter RdJun 23, 2025Replace 3ton base upflow gas system · 111 m away
- 643 Harter RdAug 5, 2026Repair leak on gas riser near exterior wall · 116 m away
- 9720 Waterview Rd · Dallas ISDSep 2, 2026Victor h hexter elementary school — new construction — second phase of replacement school consisting of site improvements · 130 m away
- 717 Peavy RdNov 6, 2020Upgrade existing electrical service · 133 m away
- 620 Peavy RdNov 19, 2025Replacing one 4 ton system · 137 m away
- 620 Harter RdAug 7, 2026620 harter install 10 concrete pilings to stabilize foundation · 139 m away
- 610 Peavy RdOct 28, 2020Electrical repairs · 147 m away
- 728 Peavy RdJul 27, 2026Electrical, new residence, new panel & service · 157 m away
- 607 Harter RdMar 3, 2026The main system and the garage's upper floor system will be replaced, a new copper line will be installed, and the main system ducts will be replaced · 168 m away