HVAC replacement and sewer tunnel permits at 828 Peavy Rd
Dallas permits filed in July 2025 and February 2026 document replacement of a 3.5-ton gas HVAC system and a 10-foot sewer tunnel at 828 Peavy Road. The records describe residential mechanical and plumbing work, not a new building.
Summarized from City of Dallas records · updated Feb 6, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 6, 2026
- since Jul 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 828 Peavy Rd
What is being built at 828 Peavy Rd, Dallas?
City of Dallas permits document a 10-foot sewer tunnel and replacement of a 3.5-ton gas HVAC system. The records describe work at a residence, not construction of a new building.
When were permits filed for work at 828 Peavy Rd?
The HVAC permit was filed July 11, 2025, and the sewer tunnel permit was filed February 6, 2026.
What does permit RES-PLM-26-001426 cover?
The City of Dallas residential plumbing permit, filed February 6, 2026, describes a 10-foot sewer tunnel at 828 Peavy Road.
What does permit RES-MEC-25-001218 cover?
The City of Dallas residential mechanical permit, filed July 11, 2025, describes replacement of a 3.5-ton base upflow gas system.
Is a new home being built at 828 Peavy Rd?
The two listed permits describe sewer and HVAC work at a residence. They do not document construction of a new home.
What work is happening near the Corporation of the Episcopal Diocese of Dallas?
At 828 Peavy Road, about 229 meters from the Corporation of the Episcopal Diocese of Dallas at 848 Harter Road, city permits document a sewer tunnel and HVAC replacement.
Also being built nearby
All of 75218- 836 Peavy RdJan 21, 2026Run gas line to generator · 31 m away
- 815 Peavy RdAug 4, 2026Panel upgrade · 54 m away
- 819 Lake Terrace DrJul 11, 2025Gas test · 89 m away
- 827 Lake Terrace DrJul 8, 2026New yard service and new repipe under home complete new gas system · 98 m away
- 809 Lake Terrace DrJun 1, 2026Removal of existing hvac system and installation of new hvac system · 99 m away
- 824 Lake Terrace DrDec 10, 2020Electrical repairs · 105 m away
- 857 Peavy RdMay 30, 2025? replacement of the main electrical service that has been updated but was done improperly and is needing to be repaired. with this option we would;? remove the existing pancake meter base. then relocate and install a new 200a service (meter base, riser, point of attachment (poa), 200a fused disconnect, wire, etc)?coordinate with oncor and have them install a new overhead service conductor since the existing is starting to crack and corrode? install new copper 4 wire ser conductor from main service disconnect to the breaker panel? new whole home grounding system to meet current nec code requirements (supplemental & intersystem bonding bridge)? install a new #4 cold water bonding wire to the outside disconnect to meet nec requirements for bonding and grounding of main electrical service? micro surge protector (5 year/ $25,000 manufacturer’s connected equipment warranty)? install afci & gfci protection to all circuits required by nec standards · 109 m away
- 9730 Bluff Dale DrSep 1, 2026Water heater 50 gal · 120 m away
- 861 Peavy RdJul 7, 2025Foundation repair-install 8 steel piers under the home to stabilize the foundation · 124 m away
- 865 Peavy RdSep 3, 2026Underground gas line replacement · 139 m away
- 9805 Bluff Dale DrOct 16, 20251 pad and block set1 access hole84 ft lineal feet of floor joist37.35 ft lineal feet of sill plate · 153 m away
- 868 Peavy RdFeb 11, 2026Replace sewer · 154 m away