New in-ground pool and generator work at 836 Peavy Road
Dallas permits indicate a new in-ground gunite swimming pool with paver decking at 836 Peavy Road, along with electrical and gas work for pool equipment. The pool permit was filed October 23, 2025; additional permits filed through January 21, 2026, cover a 26-kilowatt generator, a gas line, and other home utility work.
Summarized from City of Dallas records · updated Jan 21, 2026
- Projects
- 12
- 12 filings
- Latest filing
- Jan 21, 2026
- since Oct 12, 2020
- Largest scope
- —
- Listed value
- $5K
- partial · often understated
Permit & project history
12 projectsSources: City of Dallas
Questions about 836 Peavy Rd
What is being built at 836 Peavy Road?
A City of Dallas permit filed October 23, 2025, describes a new in-ground gunite swimming pool with paver decking. Related permits cover pool lighting and equipment.
Is a generator being installed at 836 Peavy Road?
Yes. A December 11, 2025, residential electrical permit, RES-ELC-25-005111, describes installing a 26-kilowatt generator with a 200-amp automatic transfer switch and natural gas connections.
When were permits filed for work at 836 Peavy Road?
The records span October 14, 2025, through January 21, 2026. They include permits for a pool, generator, gas lines, and electrical work.
What other work is permitted at 836 Peavy Road?
The permits also describe converting overhead electrical service to underground, running a gas line to the pool heater, and installing a gas furnace and air conditioner.
What is being built near St. John's Episcopal School at 836 Peavy Road?
Permits for 836 Peavy Road, about 214 meters from the school's library renovations at 848 Harter Road, describe a new in-ground pool and related residential utility work.
Also being built nearby
All of 75218- 828 Peavy RdFeb 6, 202610' sewer tunnel · 31 m away
- 857 Peavy RdMay 30, 2025? replacement of the main electrical service that has been updated but was done improperly and is needing to be repaired. with this option we would;? remove the existing pancake meter base. then relocate and install a new 200a service (meter base, riser, point of attachment (poa), 200a fused disconnect, wire, etc)?coordinate with oncor and have them install a new overhead service conductor since the existing is starting to crack and corrode? install new copper 4 wire ser conductor from main service disconnect to the breaker panel? new whole home grounding system to meet current nec code requirements (supplemental & intersystem bonding bridge)? install a new #4 cold water bonding wire to the outside disconnect to meet nec requirements for bonding and grounding of main electrical service? micro surge protector (5 year/ $25,000 manufacturer’s connected equipment warranty)? install afci & gfci protection to all circuits required by nec standards · 78 m away
- 815 Peavy RdAug 4, 2026Panel upgrade · 82 m away
- 819 Lake Terrace DrJul 11, 2025Gas test · 88 m away
- 827 Lake Terrace DrJul 8, 2026New yard service and new repipe under home complete new gas system · 89 m away
- 861 Peavy RdJul 7, 2025Foundation repair-install 8 steel piers under the home to stabilize the foundation · 93 m away
- 824 Lake Terrace DrDec 10, 2020Electrical repairs · 100 m away
- 809 Lake Terrace DrJun 1, 2026Removal of existing hvac system and installation of new hvac system · 108 m away
- 865 Peavy RdSep 3, 2026Underground gas line replacement · 109 m away
- 868 Peavy RdFeb 11, 2026Replace sewer · 123 m away
- 841 Lake Terrace CirSep 3, 2025Install new condenser unit coil and furnace · 148 m away
- 853 Lake Terrace CirJul 31, 20263 ton base upflow gas system · 149 m away