848 Harter Road
Dallas, TX 75218 · St. John's Episcopal School - Library Renovations, St. John's Episcopal School Enclosed Pergola + 1 more
St. John's Episcopal School auditorium to become library
St. John's Episcopal School is renovating an existing auditorium at 848 Harter Road into a school library. The 1,500-square-foot project was registered with TDLR on April 7, 2026; the applicant's estimated project cost is $3.5 million.
Summarized from Texas Department of Licensing and Regulation records · updated Apr 7, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Apr 7, 2026
- since Jun 30, 2025
- Largest scope
- 2,100 sf
- Estimated cost
- $3.5M
- state registration
Where this project stands
In state plan reviewSt. John's Episcopal School - Library Renovations
1,500 sq ft · $3.5M est.
- RegisteredApr 7, 2026
- Plan reviewnow
- ConstructionAug '26 – Feb '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
3 projectsRenovation of an existing auditorium into a new school library. — st. john's episcopal school
TDLR project registrationRenovation/AlterationProject Registered1,500 sq ft$3.5M est.- Project #
- TABS2026017054
- Tenant / owner
- St. John's Episcopal School - Library Renovations
- Design firm
- Pro
- Contact
- Pro
Building an conditioned enclosure around an existing outdoor sitting area. — st. john's episcopal school
TDLR project registrationRenovation/AlterationReview Complete2,100 sq ft$950K est.- Project #
- TABS2025022320
- Tenant / owner
- St. John's Episcopal School Enclosed Pergola
- Design firm
- Pro
- Contact
- Pro
Addition of a conference room and offices to an existing school — st. john's episcopal school
TDLR project registrationAdditions to Existing BuildingReview Complete1,800 sq ft$1.2M est.- Project #
- TABS2025022317
- Tenant / owner
- St. John's Episcopal School Hillcrest Patio
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 848 Harter Road
What is being built at 848 Harter Road in Dallas?
An existing auditorium at St. John's Episcopal School is being renovated into a school library. The project was registered with TDLR on April 7, 2026.
Is St. John's Episcopal School getting a new library?
The TDLR registration describes renovations to convert an existing auditorium into a new school library. It lists 1,500 square feet of work.
When was the library renovation at 848 Harter Road registered?
The project was registered with TDLR on April 7, 2026. Its registration number is TABS2026017054.
How much will the St. John's Episcopal School library renovation cost?
The applicant's estimated cost for the project is $3.5 million, according to the TDLR registration.
Is the project at 848 Harter Road new construction?
The registration classifies it as a renovation or alteration. It describes converting an existing auditorium into a school library.
Also being built nearby
All of 75218- 848 Harter RdJul 16, 2026Wiring up new lighting and adding circuits
- 9548 Peninsula DrNov 17, 2020Remove existing roof and install new roof · 114 m away
- 9543 Peninsula DrOct 14, 2026Demolition of house · 127 m away
- 9552 Riverton RdNov 14, 2025New gas line 90 ft · 151 m away
- 9546 Riverton RdJan 8, 2021Install water heater · 159 m away
- 9527 Peninsula DrJul 9, 2025Wire swimming pool · 161 m away
- 9542 Biscayne BlvdNov 9, 2026Demolish existing house & foundation system down to dirt; remove piers 2' below existing grade remove concrete driveway up to approach remove concrete sidewalk remove unshared chain-link fencingload, transport, & legally dispose of resultant debris · 165 m away
- 9542 Riverton RdAug 29, 2025Washer machine (box) & ice maker line · 165 m away
- 9538 Riverton RdApr 24, 202650 gal gas water heater · 170 m away
- 861 Peavy RdJul 7, 2025Foundation repair-install 8 steel piers under the home to stabilize the foundation · 179 m away
- 865 Peavy RdSep 3, 2026Underground gas line replacement · 180 m away
- 857 Peavy RdMay 30, 2025? replacement of the main electrical service that has been updated but was done improperly and is needing to be repaired. with this option we would;? remove the existing pancake meter base. then relocate and install a new 200a service (meter base, riser, point of attachment (poa), 200a fused disconnect, wire, etc)?coordinate with oncor and have them install a new overhead service conductor since the existing is starting to crack and corrode? install new copper 4 wire ser conductor from main service disconnect to the breaker panel? new whole home grounding system to meet current nec code requirements (supplemental & intersystem bonding bridge)? install a new #4 cold water bonding wire to the outside disconnect to meet nec requirements for bonding and grounding of main electrical service? micro surge protector (5 year/ $25,000 manufacturer’s connected equipment warranty)? install afci & gfci protection to all circuits required by nec standards · 180 m away