Chase banking center planned for 9409 Garland Road
A new 3,659-square-foot, one-story retail banking center with two freestanding drive-up ATMs is planned at 9409 Garland Road. The Texas Department of Licensing and Regulation registered the project on October 29, 2026, under project number TABS2027004759. The applicant’s estimated project cost is $4,805,653.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 29, 2026
- since Oct 29, 2026
- Largest scope
- 3,659 sf
- Estimated cost
- $4.8M
- state registration
Where this project stands
In state plan reviewChase Casa Linda - Relo Redev
3,659 sq ft · $4.8M est.
- RegisteredOct 29, 2026
- Plan reviewnow
- ConstructionOct '27 – Jul '28
- Inspected
- Closed
Construction is scheduled to start Oct 25, 2027. Subcontractors and suppliers are usually picked in the weeks before.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectNew construction of a 1-story retail banking center (3,659 sq ft) with (2) remote freestanding drive-up atm's — chase casa linda - relo redev
TDLR project registrationNew ConstructionProject Registered3,659 sq ft$4.8M est.- Project #
- TABS2027004759
- Tenant / owner
- Chase Casa Linda - Relo Redev
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9409 Garland Road
What is being built at 9409 Garland Road?
The project registration describes a new, one-story retail banking center of 3,659 square feet with two freestanding drive-up ATMs. It is listed as Chase Casa Linda - Relo Redev.
When was the Chase Casa Linda project registered?
The Texas Department of Licensing and Regulation registered it on October 29, 2026. The project number is TABS2027004759.
Is a new bank being built near Reformed Pilates on Garland Road?
A new one-story retail banking center with two drive-up ATMs is planned at 9409 Garland Road, about 42 meters from Reformed Pilates at 9440 Garland Road.
What's being built near Maman - Casa Linda?
A 3,659-square-foot retail banking center with two freestanding drive-up ATMs is planned at 9409 Garland Road, about 221 meters from Maman - Casa Linda at 1152 N Buckner Boulevard.
How large is the new banking center at 9409 Garland Road?
The registered plans describe a one-story building with 3,659 square feet of space, plus two freestanding drive-up ATMs.
What is the estimated cost of the 9409 Garland Road project?
The applicant’s estimated cost is $4,805,653. This is the project estimate listed in the TDLR registration.
Also being built nearby
All of 75218- 9409 Garland RdNov 4, 2026New construction of a 1 story retail bank, 3569 sq ft @ standalone drive up atm's
- 9440 Garland Road · Reformed PilatesJan 5, 2026Reformed pilates — renovation/alteration — interior finish-out of existing lease space. existing and new electrical, mechanical and plumbing equipment · 42 m away
- 9440 Garland RdFeb 5, 2026Install new duct only · 42 m away
- 9371 Garland RdFeb 23, 2026Service release no work · 52 m away
- 9365 Garland RdSep 8, 2026New main circuit breaker and generator with ats · 58 m away
- 9343 Garland RdJan 28, 2021Install swimming pool · 81 m away
- 9335 Garland RdNov 5, 2025Repair gas line · 89 m away
- 9352 Angora StSep 24, 2025Gas test using air pressure. the property is a duplex, but since we are doing only one unit, i registered the permit as a residential single family. this is the way the buildng inspection office told me to do so i wouldn't get charged for two units of the duplex residence · 141 m away
- 9412 Forest Hills BlvdJan 1, 2026Gas test · 148 m away
- 9331 Angora StJun 9, 202626kw kohler generator installation · 163 m away
- 1151 N Buckner BlvdJul 8, 2026Commercial remodel · 164 m away
- 9326 Angora StSep 29, 2025We will then tunnel approximately 50ft under home to expose old cast iron sewer lines. we will then remove old cast iron and replace with schedule 40 pvc. bid also includes running a new water main from the front yard towards the home. will add a homeowner shut off valve before entering crawlspace. includes all new water connections through the floor. this includes both bathrooms, kitchen and washer** scope change **we will be replacing the entire sewer line and we are going to be replacing two fifty gallon water heaters with new units as well. the sewer line portion will be replaced with brand new schedule 40 pvc · 188 m away
More retail spaces in 75218.