4501 Afton St
Dallas, TX 75219
New construction permits filed at 4501 Afton St
City of Dallas permits indicate new construction at 4501 Afton St, including electrical work for numbered units and buildings. The records span September 12, 2025, through August 4, 2026, with recent plumbing and retaining-wall permits also filed.
Summarized from City of Dallas records · updated Aug 4, 2026
- Projects
- 29
- 29 filings
- Latest filing
- Aug 4, 2026
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- $2.5M
- partial · often understated
Permit & project history
29 projectsSources: City of Dallas
Questions about 4501 Afton St
What is being built at 4501 Afton St in Dallas?
City permits indicate new construction, with electrical permits referencing units 1 through 5 and buildings 6, 7 and 8. The records do not specify the project’s use.
When were permits filed for 4501 Afton St?
The City of Dallas records span September 12, 2025, through August 4, 2026. Several electrical permits for new construction were filed August 4, 2026.
What construction work is happening at 4501 Afton St?
Recent permits cover electrical work for new construction, plumbing, and stone-and-mortar retaining walls with a maximum height of 8 feet. The retaining-wall permit was filed July 27, 2026.
What are the permit numbers for 4501 Afton St?
Recent records include electrical permits COM-ELC-26-003571 through COM-ELC-26-003581, plumbing permits COM-PLM-26-002725 and COM-PLM-26-002726, and retaining-wall permit COM-ACC-26-000191.
Is a new commercial project planned at 4501 Afton St, Dallas, TX 75219?
City of Dallas commercial permits indicate new construction at the address. The records do not identify an occupant or describe the project’s intended use.
Also being built nearby
All of 75219- 4515 Afton StSep 6, 2025New 8 ft cedar wood stained fence 1x6x8 cedar pickets 8 ft tall 2x3 - 2x4 rails 4x4 metal round poles with caps for 2 duplex 2 pedestrian 8ft gates per duplex; total of 4 per pedestrian gates for entire building · 24 m away
- 4523 Afton StFeb 20, 2026Remove existing tpo roofing system at isolated roof ledge area approximately 33 square feet in size. scope includes removal of existing tpo membrane, iso insulation board, edge metal, and associated flashings within this section only. temporarily detach adjacent gutter as required to complete work. inspect roof decking; replace any limited deteriorated decking as necessary(anticipated minor repair only). no structural framing modifications are proposed under this permit.install new polyisocyanurate (iso) insulation system, including tapered iso as required to provide positive drainage and proper slope toward the existing gutter. install new fully adhered tpo membrane system with manufacturer-approved adhesives, flashings, and edge metal per code and manufacturer specifications. reinstall gutter upon completion. work is limited to this 33 square foot roof ledge area only · 37 m away
- 2221 Lucas DrOct 12, 2026Condensate drains and reroute of roof drains · 37 m away
- 2221 Lucas Drive · Dallas Independent School DistrictAug 28, 2024Csp #j283_p1000_1 org 283 - esparanza "hope" medrano elementary school - renovation — renovation/alteration — secured vestibule addition and roof replacement · 37 m away
- 2334 Arroyo AveNov 16, 2026Permit for the recently installed fence and gates at 2334 arroyo avenue, dallas, tx, as shown on site plan a100. along the driveway and garage side and across the rear, a 3 foot 11inch-high concrete retaining wall supports a 4, inch-foot-high board-on-board cedar fence, for a combined height of 8 feet. the opposite walkway side has an 8-foot-high board-on-board cedar fence. two metal swing gates cross the walkway at the front and rear. each gate is 10 feet wide by 6 feet high, swings clockwise, and uses moonlight g2 mechanical exterior door locks · 93 m away
- 2338 Arroyo AveSep 15, 2025Temp fence in preparation for construction · 93 m away
- 2342 Arroyo AveSep 15, 2025Temp fence in preparation for construction · 94 m away
- 2346 Arroyo AveOct 1, 2026Mcr retaining wall for future construction of new mfd project · 96 m away
- 2318 Arroyo AveDec 10, 2025Gas test · 96 m away
- 2348 Arroyo AveSep 14, 2026Qteam meeting 10.14.26 (all day) - qteam submittal of new construction project of 21 unit mfd. 55972 sq ft · 97 m away
- 2316 Arroyo AveDec 10, 2025Gas test · 98 m away
- 2314 Arroyo AveSep 24, 2026Install new hvac system with ductwork · 99 m away