4515 Afton St
Dallas, TX 75219
8-foot cedar fence permitted at 4515 Afton St
A City of Dallas permit filed September 6, 2025, covers a new 8-foot stained cedar fence at 4515 Afton St. The permit description says the fence and pedestrian gates serve two duplexes; it does not document new home construction at this address.
Summarized from City of Dallas records · updated Sep 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 6, 2025
- since Sep 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectNew 8 ft cedar wood stained fence 1x6x8 cedar pickets 8 ft tall 2x3 - 2x4 rails 4x4 metal round poles with caps for 2 duplex 2 pedestrian 8ft gates per duplex; total of 4 per pedestrian gates for entire building
New 8 ft cedar wood stained fence 1x6x8 cedar pickets 8 ft tall 2x3 - 2x4 rails 4x4 metal round poles with caps for 2 duplex 2 pedestrian 8ft gates per duplex; total of 4 per pedestrian gates for entire building
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 4515 Afton St
What is being built at 4515 Afton St in Dallas?
A City of Dallas permit covers an 8-foot stained cedar fence and pedestrian gates serving two duplexes. The permit, RES-ACC-25-000472, was filed September 6, 2025.
When was the fence permit filed for 4515 Afton St?
The City of Dallas filed permit RES-ACC-25-000472 on September 6, 2025.
Is a new townhome being built at 4515 Afton St?
The available permit is for a fence, not new home construction. Its description says the fence serves two duplexes.
What kind of fence is planned at 4515 Afton St?
The permit describes an 8-foot cedar wood fence with stained cedar pickets, along with pedestrian gates.
What is being built near Dallas Independent School District on Lucas Drive?
At 4515 Afton St, about 43 meters from the Dallas Independent School District address listed at 2221 Lucas Drive, a permit covers an 8-foot stained cedar fence serving two duplexes. The permit was filed September 6, 2025.
Also being built nearby
All of 75219- 4523 Afton StFeb 20, 2026Remove existing tpo roofing system at isolated roof ledge area approximately 33 square feet in size. scope includes removal of existing tpo membrane, iso insulation board, edge metal, and associated flashings within this section only. temporarily detach adjacent gutter as required to complete work. inspect roof decking; replace any limited deteriorated decking as necessary(anticipated minor repair only). no structural framing modifications are proposed under this permit.install new polyisocyanurate (iso) insulation system, including tapered iso as required to provide positive drainage and proper slope toward the existing gutter. install new fully adhered tpo membrane system with manufacturer-approved adhesives, flashings, and edge metal per code and manufacturer specifications. reinstall gutter upon completion. work is limited to this 33 square foot roof ledge area only · 14 m away
- 4501 Afton StAug 4, 2026Installing electric for new construction (unit 3) · 24 m away
- 2221 Lucas DrOct 12, 2026Condensate drains and reroute of roof drains · 43 m away
- 2221 Lucas Drive · Dallas Independent School DistrictAug 28, 2024Csp #j283_p1000_1 org 283 - esparanza "hope" medrano elementary school - renovation — renovation/alteration — secured vestibule addition and roof replacement · 43 m away
- 2334 Arroyo AveNov 16, 2026Permit for the recently installed fence and gates at 2334 arroyo avenue, dallas, tx, as shown on site plan a100. along the driveway and garage side and across the rear, a 3 foot 11inch-high concrete retaining wall supports a 4, inch-foot-high board-on-board cedar fence, for a combined height of 8 feet. the opposite walkway side has an 8-foot-high board-on-board cedar fence. two metal swing gates cross the walkway at the front and rear. each gate is 10 feet wide by 6 feet high, swings clockwise, and uses moonlight g2 mechanical exterior door locks · 116 m away
- 2338 Arroyo AveSep 15, 2025Temp fence in preparation for construction · 117 m away
- 2342 Arroyo AveSep 15, 2025Temp fence in preparation for construction · 117 m away
- 2346 Arroyo AveOct 1, 2026Mcr retaining wall for future construction of new mfd project · 119 m away
- 2318 Arroyo AveDec 10, 2025Gas test · 119 m away
- 2348 Arroyo AveSep 14, 2026Qteam meeting 10.14.26 (all day) - qteam submittal of new construction project of 21 unit mfd. 55972 sq ft · 120 m away
- 2316 Arroyo AveDec 10, 2025Gas test · 120 m away
- 2314 Arroyo AveSep 24, 2026Install new hvac system with ductwork · 121 m away
More townhomes in 75219.