Recent · latest filing Oct 2025Commercial
10522 Shady Trl
Dallas, TX 75220
Gas meter relocation at 10522 Shady Trl
A City of Dallas commercial plumbing permit filed Oct. 29, 2025, covers relocating a gas meter at 10522 Shady Trl. The record does not specify other work at the property.
Summarized from City of Dallas records · updated Oct 29, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 29, 2025
- since Oct 29, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 10522 Shady Trl
What work is planned at 10522 Shady Trl?
A City of Dallas permit covers relocating a gas meter. The record does not describe additional work.
When was the gas meter relocation permitted?
The permit was filed Oct. 29, 2025.
What is the permit number for 10522 Shady Trl?
The permit number is COM-PLM-25-002351.
Is a new building being built at 10522 Shady Trl?
The available permit describes a gas meter relocation, not new building construction.
What type of permit was filed for 10522 Shady Trl?
It is a commercial plumbing permit from the City of Dallas, filed Oct. 29, 2025.
Also being built nearby
All of 75220- 2610 Myrtle Springs AveOct 20, 2025Gas meter relocate · 90 m away
- 10588 Shady TrlJul 21, 2025Restore power · 137 m away
- 10647 Shady TrlDec 19, 2025Existing stone to be removed from rooftop by way of industrial vacuum services. access will be required next to building for vac truck to access site.furnish and install 1 new layer of 1” polyisocyanurate insulation, mechanically fastened through existing roof to the deck using #15 fasteners and induction weld plates.furnish and install new 60 mil induction welded tpo roof system.furnish and install 24-gauge galvanized counterflashing at rise walls.furnish and install new tpo clad metal edge at existing gutter locations.furnish and install new 24-gauge pre-finished metal edge at existing metal edge location without gutter.furnish and install new 24-gauge pre-finished sheet metal coping at existing parapet walls.furnish and install new 24-gauge pre-finished sheet metal gutter and downspouts at existing locations.flash all curbs and penetrations per manufacturer’s specifications.furnish and install new tpo walk-pad at service side of mechanical curbs and roof access point.upon completion of the roof project remove, all job-related materials and debris · 159 m away
- 10606 Shady TrlNov 18, 2026Perform a gas test · 181 m away
- 2614 Freewood DrApr 24, 2026To install double check valve in the yard · 186 m away
- 10655 Shady TrlDec 28, 2020Preventive maintenance for electrical service · 188 m away
- 2630 Myrtle Springs AveJan 5, 2026No work · 211 m away
- 2623 Freewood DrDec 15, 2020Building (bu) commercial renovation · 230 m away
- 2631 Freewood DrDec 8, 2025Gas repair with gas test · 271 m away
- 2636 Freewood DrApr 27, 20261. install new customer supplied transocket on exterior of building2. install new 400 amp 3-phase fusible disconnect next to transocket3. install new service riser & grounding electrode conductor4. refeed existing electrical panels inside warehouse from new service · 298 m away
- 2605 Brenner DrApr 3, 20261" irrigation backflow (double check) · 343 m away
- 2630 Brenner DrOct 21, 2020Remove existing roof and install new roof · 354 m away