2614 Freewood Dr
Dallas, TX 75220
Yard double-check valve permitted at 2614 Freewood Dr
A City of Dallas commercial plumbing permit indicates a double-check valve will be installed in the yard at 2614 Freewood Dr. The permit, COM-PLM-26-001556, was filed on April 24, 2026.
Summarized from City of Dallas records · updated Apr 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 24, 2026
- since Apr 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2614 Freewood Dr
What is being built at 2614 Freewood Dr?
A City of Dallas plumbing permit describes installation of a double-check valve in the yard. It does not describe a new building.
What work does permit COM-PLM-26-001556 cover?
The permit covers installing a double-check valve in the yard at 2614 Freewood Dr.
When was the plumbing permit filed?
Permit COM-PLM-26-001556 was filed on April 24, 2026.
Is a new commercial building planned at 2614 Freewood Dr?
The record is for a commercial plumbing permit to install a double-check valve in the yard; it does not describe a new building.
Who filed the permit for 2614 Freewood Dr?
The available record identifies the source as the City of Dallas and does not name an owner or occupant.
Also being built nearby
All of 75220- 2623 Freewood DrDec 15, 2020Building (bu) commercial renovation · 57 m away
- 10588 Shady TrlJul 21, 2025Restore power · 104 m away
- 10606 Shady TrlNov 18, 2026Perform a gas test · 106 m away
- 2631 Freewood DrDec 8, 2025Gas repair with gas test · 113 m away
- 10647 Shady TrlDec 19, 2025Existing stone to be removed from rooftop by way of industrial vacuum services. access will be required next to building for vac truck to access site.furnish and install 1 new layer of 1” polyisocyanurate insulation, mechanically fastened through existing roof to the deck using #15 fasteners and induction weld plates.furnish and install new 60 mil induction welded tpo roof system.furnish and install 24-gauge galvanized counterflashing at rise walls.furnish and install new tpo clad metal edge at existing gutter locations.furnish and install new 24-gauge pre-finished metal edge at existing metal edge location without gutter.furnish and install new 24-gauge pre-finished sheet metal coping at existing parapet walls.furnish and install new 24-gauge pre-finished sheet metal gutter and downspouts at existing locations.flash all curbs and penetrations per manufacturer’s specifications.furnish and install new tpo walk-pad at service side of mechanical curbs and roof access point.upon completion of the roof project remove, all job-related materials and debris · 116 m away
- 10655 Shady TrlDec 28, 2020Preventive maintenance for electrical service · 120 m away
- 2636 Freewood DrApr 27, 20261. install new customer supplied transocket on exterior of building2. install new 400 amp 3-phase fusible disconnect next to transocket3. install new service riser & grounding electrode conductor4. refeed existing electrical panels inside warehouse from new service · 154 m away
- 2630 Brenner DrOct 21, 2020Remove existing roof and install new roof · 176 m away
- 10522 Shady TrlOct 29, 2025Gas meter relocate · 186 m away
- 2623 Brenner DrNov 3, 2020Install new plumbing · 193 m away
- 2605 Brenner DrApr 3, 20261" irrigation backflow (double check) · 200 m away
- 2610 Myrtle Springs AveOct 20, 2025Gas meter relocate · 218 m away