groundranger
Historic · latest filing Nov 2020Commercial

2514 Community Dr

Dallas, TX 75220

2514 Community Dr: 1 project on record

City of Dallas lists 1 filing across 1 project at 2514 Community Dr, Dallas, TX 75220. The most recent, filed November 9, 2020, covers: “Electrical repairs”.

Compiled from City of Dallas records · updated Nov 9, 2020

Projects
1
1 filings
Latest filing
Nov 9, 2020
since Nov 9, 2020
Largest scope
—
Listed value
$9
partial · often understated

Permit & project history

1 project
  1. Electrical repairs

    Electrical repairs

    City of Dallas permitElectrical (EL) Multi Family Alteration$9
    Record
    2011093012
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 2514 Community Dr

What is being built at 2514 Community Dr?

The latest filing (City of Dallas permit 2011093012, November 9, 2020) covers electrical repairs.

How many permits and filings does 2514 Community Dr have?

1 filing across 1 project, from November 9, 2020 to November 9, 2020.

How much is the construction at 2514 Community Dr worth?

Permits at this address list about $9 in valuations. Permit valuations are often partial and understate total project cost.

What is being built near Greyhound Lines, in Dallas?

2514 Community Dr is about 259 m from Greyhound Lines, (9773 Harry Hines Blvd). Its latest filing is for electrical repairs.

Is there other construction near 2514 Community Dr?

Yes. Nearby filings include 2625 Community Dr (commercial remodel, units #268, #2000, #1049, #1072, #1021 have been up to date in electrical, plumbing, and hvac. previous owners remodel units and did not pull permit. new owner requested to remodel and bring unit up to dallas code, Apr 4, 2025); 2625 Community Dr (meter repairs building # 21, Sep 11, 2020); 2555 Webb Chapel Ext (building 1we are installing a new 800a utility meter transocket. 1. existing overhead utility service conductors are landed into an existing 800a main breaker disconnect. 2. we are removing existing service conductors from the 800a disconnect and landing them into the line side of new utility meter transocket. 3. we will then run conductors from load side of new utility transocket back to the 800a main breaker disconnect.we have 4 buildings at this property and will file a permit for each building, as oncor has created a new main electric meter address for each building, Nov 18, 2025).

How do I get alerts for new permits at 2514 Community Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75220
Get alerts for 2514 Community Dr