2655 Myrtle Springs Ave
Dallas, TX 75220
Permit filed for a 10-gallon electric water heater
A City of Dallas residential plumbing permit for a 10-gallon electric water heater at 2655 Myrtle Springs Ave was filed on January 7, 2026. The records also show permits for an interior remodel and HVAC work at the address in 2019.
Summarized from City of Dallas records · updated Jan 7, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jan 7, 2026
- since Jan 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 2655 Myrtle Springs Ave
What is happening at 2655 Myrtle Springs Ave?
A City of Dallas permit filed January 7, 2026, describes work on a 10-gallon electric water heater. The permit number is RES-PLM-26-000199.
When was the water heater permit filed at 2655 Myrtle Springs Ave?
The residential plumbing permit was filed on January 7, 2026.
Is a new building being constructed at 2655 Myrtle Springs Ave?
The available permit describes a 10-gallon electric water heater, not new construction.
What other permits were filed for 2655 Myrtle Springs Ave?
City records list an interior remodel permit dated October 7, 2019, and an HVAC system installation permit dated July 25, 2019.
What is being worked on near Bodega Fine Spirits on Harry Hines Boulevard?
At 2655 Myrtle Springs Ave, about 376 meters from Bodega Fine Spirits, a permit filed January 7, 2026, describes work on a 10-gallon electric water heater.
Also being built nearby
All of 75220- 2663 Myrtle Springs AveNov 4, 2026New construction-addition plumbing · 59 m away
- 10539 Maybank DrDec 17, 2025Gas test for atmos release · 147 m away
- 2630 Myrtle Springs AveJan 5, 2026No work · 162 m away
- 2646 Freewood DrOct 7, 2020Permanent electrical service · 206 m away
- 2655 Freewood DrOct 5, 2026Service release for electrical following our tenant moving out on 09/30/26 · 215 m away
- 2663 Lombardy LnMar 3, 2026Relocate gas line · 230 m away
- 2636 Freewood DrApr 27, 20261. install new customer supplied transocket on exterior of building2. install new 400 amp 3-phase fusible disconnect next to transocket3. install new service riser & grounding electrode conductor4. refeed existing electrical panels inside warehouse from new service · 231 m away
- 2674 Myrtle Springs AveOct 22, 2026This is a service entrance upgrade from 200 amps to 600 amps with 3 meter sockets and 2 new electrical panels · 232 m away
- 2670 Lombardy LnMar 5, 2026Erect fire barrier (2 hour) · 258 m away
- 2631 Freewood DrDec 8, 2025Gas repair with gas test · 264 m away
- 2650 Lombardy LnDec 17, 2025Repaired 8 gas leaks. gas test request · 265 m away
- 2677 Freewood DrJul 28, 2026Replace gas piping · 274 m away