506 Blair Blvd
Dallas, TX 75223
506 Blair Blvd: 3 projects on record
City of Dallas lists 3 filings across 3 projects at 506 Blair Blvd, Dallas, TX 75223. The most recent, filed May 30, 2025, covers: “Gas repair with test”.
Compiled from City of Dallas records · updated May 30, 2025
- Projects
- 3
- 3 filings
- Latest filing
- May 30, 2025
- since May 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 506 Blair Blvd
What is being built at 506 Blair Blvd?
The latest filing (City of Dallas permit RES-PLM-25-000890, May 30, 2025) covers gas repair with test.
How many permits and filings does 506 Blair Blvd have?
3 filings across 3 projects, from May 30, 2025 to May 30, 2025.
Is there other construction near 506 Blair Blvd?
Yes. Nearby filings include 6939 Santa Fe Ave (replace main sewer line, Oct 28, 2020); 7111 Santa Fe Ave (gas leak repair, Sep 9, 2025); 614 Blair Blvd (addition of 670 sq ft, Sep 10, 2026).
How do I get alerts for new permits at 506 Blair Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 6939 Santa Fe AveOct 28, 2020Replace main sewer line · 90 m away
- 7111 Santa Fe AveSep 9, 2025Gas leak repair · 119 m away
- 614 Blair BlvdSep 10, 2026Addition of 670 sq ft · 119 m away
- 7120 Santa Fe AveSep 21, 2026Sewer service replacement · 132 m away
- 7121 Santa Fe AveSep 28, 20263 ton system replacement · 132 m away
- 7123 Santa Fe AveAug 26, 2025Home needs a gas pressure test. gas was turned off 60 days ago by atmos as house was going to be vacant and for sale · 135 m away
- 623 Tenison Memorial RdSep 2, 2026Replace service entrance mast · 144 m away
- 6931 Patricia AveDec 11, 2020Install water heater · 148 m away
- 6919 Mistletoe DrApr 2, 2026Install a new horizontal system for the downstairs unit. it’s a gas furnace 4 ton complete outdoor indoor coil supply. plenums reattach the downstairs ductwork. relocate the old unit to the upstairs new construction we’re in all new ductwork to the upstairs do all the venting to the new construction of the exhaust fans · 165 m away
- 6918 Patricia AveAug 28, 2026Removal of roof and reinstalling roof · 173 m away
- 7014 Santa Monica DrMar 23, 2026Electrical for remodel · 177 m away
- 7018 Santa Monica DrMar 5, 2026Residential pool plumbing · 178 m away