6939 Santa Fe Ave
Dallas, TX 75223
6939 Santa Fe Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 6939 Santa Fe Ave, Dallas, TX 75223. The most recent, filed October 28, 2020, covers: “Replace main sewer line”.
Compiled from City of Dallas records · updated Oct 28, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2020
- since Oct 28, 2020
- Largest scope
- —
- Listed value
- $356
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 6939 Santa Fe Ave
What is being built at 6939 Santa Fe Ave?
The latest filing (City of Dallas permit 2010286008, October 28, 2020) covers replace main sewer line.
How many permits and filings does 6939 Santa Fe Ave have?
1 filing across 1 project, from October 28, 2020 to October 28, 2020.
How much is the construction at 6939 Santa Fe Ave worth?
Permits at this address list about $356 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 6939 Santa Fe Ave?
Yes. Nearby filings include 506 Blair Blvd (gas repair with test, May 30, 2025); 6911 Santa Fe Ave (replace 3 ton basic horizontal gas system, Jun 23, 2025); 6919 Mistletoe Dr (install a new horizontal system for the downstairs unit. it’s a gas furnace 4 ton complete outdoor indoor coil supply. plenums reattach the downstairs ductwork. relocate the old unit to the upstairs new construction we’re in all new ductwork to the upstairs do all the venting to the new construction of the exhaust fans, Apr 2, 2026).
How do I get alerts for new permits at 6939 Santa Fe Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 506 Blair BlvdMay 30, 2025Gas repair with test · 90 m away
- 6911 Santa Fe AveJun 23, 2025Replace 3 ton basic horizontal gas system · 97 m away
- 6919 Mistletoe DrApr 2, 2026Install a new horizontal system for the downstairs unit. it’s a gas furnace 4 ton complete outdoor indoor coil supply. plenums reattach the downstairs ductwork. relocate the old unit to the upstairs new construction we’re in all new ductwork to the upstairs do all the venting to the new construction of the exhaust fans · 99 m away
- 510 Newell AveDec 28, 2020Garage conversion · 133 m away
- 411 Newell AveJul 2, 2026Class 3 impact resistant roof replacement - out of pocket non-insurance. roof color is weathered wood. synthetic felt and all roofing requirements and materials will be installed by precision roofing & construction · 140 m away
- 6931 Patricia AveDec 11, 2020Install water heater · 144 m away
- 6918 Patricia AveAug 28, 2026Removal of roof and reinstalling roof · 167 m away
- 519 Newell AveJun 16, 2026Remodel , 3 wc, 3 lav, 3 shower, kit sk, wh elec, washer connection · 167 m away
- 614 Blair BlvdSep 10, 2026Addition of 670 sq ft · 195 m away
- 7111 Santa Fe AveSep 9, 2025Gas leak repair · 200 m away
- 6827 Santa Fe AveOct 20, 2026Addition electrical work · 205 m away
- 606 Newell AveJan 13, 2026Replaced water line in yard · 208 m away