6911 Santa Fe Ave
Dallas, TX 75223
6911 Santa Fe Ave: 1 project on record
City of Dallas lists 1 filing across 1 project at 6911 Santa Fe Ave, Dallas, TX 75223. The most recent, filed June 23, 2025, covers: “Replace 3 ton basic horizontal gas system”.
Compiled from City of Dallas records · updated Jun 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 23, 2025
- since Jun 23, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6911 Santa Fe Ave
What is being built at 6911 Santa Fe Ave?
The latest filing (City of Dallas permit RES-MEC-25-000894, June 23, 2025) covers replace 3 ton basic horizontal gas system.
How many permits and filings does 6911 Santa Fe Ave have?
1 filing across 1 project, from June 23, 2025 to June 23, 2025.
Is there other construction near 6911 Santa Fe Ave?
Yes. Nearby filings include 411 Newell Ave (class 3 impact resistant roof replacement - out of pocket non-insurance. roof color is weathered wood. synthetic felt and all roofing requirements and materials will be installed by precision roofing & construction, Jul 2, 2026); 6919 Mistletoe Dr (install a new horizontal system for the downstairs unit. it’s a gas furnace 4 ton complete outdoor indoor coil supply. plenums reattach the downstairs ductwork. relocate the old unit to the upstairs new construction we’re in all new ductwork to the upstairs do all the venting to the new construction of the exhaust fans, Apr 2, 2026); 6939 Santa Fe Ave (replace main sewer line, Oct 28, 2020).
How do I get alerts for new permits at 6911 Santa Fe Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 411 Newell AveJul 2, 2026Class 3 impact resistant roof replacement - out of pocket non-insurance. roof color is weathered wood. synthetic felt and all roofing requirements and materials will be installed by precision roofing & construction · 48 m away
- 6919 Mistletoe DrApr 2, 2026Install a new horizontal system for the downstairs unit. it’s a gas furnace 4 ton complete outdoor indoor coil supply. plenums reattach the downstairs ductwork. relocate the old unit to the upstairs new construction we’re in all new ductwork to the upstairs do all the venting to the new construction of the exhaust fans · 68 m away
- 6939 Santa Fe AveOct 28, 2020Replace main sewer line · 97 m away
- 510 Newell AveDec 28, 2020Garage conversion · 98 m away
- 6827 Santa Fe AveOct 20, 2026Addition electrical work · 110 m away
- 6819 Santa Fe AveFeb 17, 2026Gas test · 117 m away
- 519 Newell AveJun 16, 2026Remodel , 3 wc, 3 lav, 3 shower, kit sk, wh elec, washer connection · 147 m away
- 407 Monte Vista DrSep 19, 2025Running gas line from pool heater · 150 m away
- 415 Monte Vista DrOct 6, 2026Shower liner replacement · 152 m away
- 423 Monte Vista DrJun 29, 2026Add a new washer box and asink · 152 m away
- 431 Monte Vista DrApr 27, 2026Install 30 gallon electric water heater (swap out) · 154 m away
- 6931 Patricia AveDec 11, 2020Install water heater · 170 m away