Yard water line replaced at 606 Newell Ave
A water line in the yard was replaced at 606 Newell Ave, according to a City of Dallas residential plumbing permit filed January 13, 2026. The record does not specify a project valuation or square footage.
Summarized from City of Dallas records · updated Jan 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jan 13, 2026
- since Jan 13, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 606 Newell Ave
What is happening at 606 Newell Ave in Dallas?
A City of Dallas permit record describes a water line replacement in the yard. The permit, RES-PLM-26-000444, was filed January 13, 2026.
Was a new home permitted at 606 Newell Ave?
The available record is for a residential plumbing permit to replace a water line in the yard, not a new-home permit.
When was the water line permit filed for 606 Newell Ave?
The City of Dallas filed permit RES-PLM-26-000444 on January 13, 2026.
What kind of permit was issued for 606 Newell Ave?
The record identifies it as a residential plumbing permit for a yard water line replacement.
How much will the work at 606 Newell Ave cost?
The permit record does not list a reported valuation or an estimated project cost.
Also being built nearby
All of 75223- 611 Newell AveAug 5, 2026Ac swap out · 29 m away
- 615 Newell AveSep 2, 2025Install 3 ducts · 31 m away
- 6918 Patricia AveAug 28, 2026Removal of roof and reinstalling roof · 43 m away
- 6931 Patricia AveDec 11, 2020Install water heater · 68 m away
- 519 Newell AveJun 16, 2026Remodel , 3 wc, 3 lav, 3 shower, kit sk, wh elec, washer connection · 71 m away
- 715 Newell AveJul 15, 2025Replace water heater · 103 m away
- 722 Newell AveJul 30, 2025Replace existing tankless in attic with a new rinnai re180in with new concentric flu and condensate pump · 111 m away
- 626 Monte Vista DrApr 23, 2026Install new rheem 50 gallon gas water heater · 115 m away
- 510 Newell AveDec 28, 2020Garage conversion · 117 m away
- 623 Monte Vista DrApr 7, 202634ft sewer trench for main line with saw cut side walk, access up to 5ft at city tap and access under footer/pier and beam with 25ft additional excavation under pier and beam. 2 bathroom home, roughly a total of 85ft of replacement · 125 m away
- 6914 Santa Monica DrMar 25, 2026Install 9 piers; reset/reshim 323 sq ft · 131 m away
- 522 Monte Vista DrFeb 9, 2026Comp. shingle rfg. - with felt 48.26 q remove 1 layer of felt/underlayment, remove and haul off roofing felt - 15 lb. 48.26 sq remove and install new drip edge 549 lf install synthetic roofing underlayment 48.26 sq install ice and water shield on rake and valleys install laminated - comp. shingle 55.01 sq owens corning trudefinition duration storm onyx black algae resistant architectural roof shingles hip / ridge cap - standard profile - composition shingles rizeridge onyx black algae resistant hip and ridge roofing shingles189 lf remove flashing - pipe jack- 4 e.a install flashing - pipe jack 4 e.a detach & reset exhaust cap - through roof - 6" to 8" 2 e.a r&r 4 turbines weathered wood galvanized steel internally braced dual-bearing wind roof turbine r&r 60 sq. in. nfa aluminum slant back roof louver static vent in black 4 e.a prime & paint roof vent and pipes covers haul debris - per pickup truck load including dump fees · 132 m away