623 Monte Vista Dr
Dallas, TX 75223
Sewer-line replacement permitted at 623 Monte Vista Dr
A residential plumbing permit filed April 7, 2026, covers sewer-line replacement at a two-bathroom home at 623 Monte Vista Dr. The permit description says the work includes roughly 85 feet of replacement, with trenching and excavation near the city tap and beneath the pier-and-beam foundation.
Summarized from City of Dallas records · updated Apr 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 7, 2026
- since Apr 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 project34ft sewer trench for main line with saw cut side walk, access up to 5ft at city tap and access under footer/pier and beam with 25ft additional excavation under pier and beam. 2 bathroom home, roughly a total of 85ft of replacement
34ft sewer trench for main line with saw cut side walk, access up to 5ft at city tap and access under footer/pier and beam with 25ft additional excavation under pier and beam. 2 bathroom home, roughly a total of 85ft of replacement
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 623 Monte Vista Dr
What is being built at 623 Monte Vista Dr?
A City of Dallas residential plumbing permit covers sewer-line replacement at a two-bathroom home. The description refers to roughly 85 feet of replacement.
When was the sewer work permitted at 623 Monte Vista Dr?
The permit was filed on April 7, 2026.
What does permit RES-PLM-26-003653 cover?
It covers sewer-line work, including a 34-foot trench for the main line and excavation near the city tap and beneath the pier-and-beam foundation.
How much sewer line is being replaced at 623 Monte Vista Dr?
The permit description says the home will have roughly 85 feet of sewer-line replacement.
Is 623 Monte Vista Dr a new home construction project?
The record is for a residential plumbing permit describing sewer-line replacement at a two-bathroom home, not a new-home construction permit.
Also being built nearby
All of 75223- 626 Monte Vista DrApr 23, 2026Install new rheem 50 gallon gas water heater · 13 m away
- 610 Clermont AveJun 9, 2026172' of 8' tall cedar fence with one pedestrian walk gate going back into same place as existing fence · 91 m away
- 602 Clermont AveDec 5, 2025Tear off existing asphalt/fiberglass shingles and replace with asphalt/fiberglass shingles - oc duration trudef/color driftwood. not re-decking. no alterations to slope or footprint · 92 m away
- 615 Clermont AveJul 7, 2026Replace sewer line under pier & beam home and from the house to the city tap · 103 m away
- 603 Clermont AveOct 18, 2026Gas test for atmos gas release · 104 m away
- 615 Newell AveSep 2, 2025Install 3 ducts · 106 m away
- 611 Newell AveAug 5, 2026Ac swap out · 106 m away
- 522 Monte Vista DrFeb 9, 2026Comp. shingle rfg. - with felt 48.26 q remove 1 layer of felt/underlayment, remove and haul off roofing felt - 15 lb. 48.26 sq remove and install new drip edge 549 lf install synthetic roofing underlayment 48.26 sq install ice and water shield on rake and valleys install laminated - comp. shingle 55.01 sq owens corning trudefinition duration storm onyx black algae resistant architectural roof shingles hip / ridge cap - standard profile - composition shingles rizeridge onyx black algae resistant hip and ridge roofing shingles189 lf remove flashing - pipe jack- 4 e.a install flashing - pipe jack 4 e.a detach & reset exhaust cap - through roof - 6" to 8" 2 e.a r&r 4 turbines weathered wood galvanized steel internally braced dual-bearing wind roof turbine r&r 60 sq. in. nfa aluminum slant back roof louver static vent in black 4 e.a prime & paint roof vent and pipes covers haul debris - per pickup truck load including dump fees · 120 m away
- 715 Newell AveJul 15, 2025Replace water heater · 121 m away
- 606 Newell AveJan 13, 2026Replaced water line in yard · 125 m away
- 516 Monte Vista DrJul 29, 2025Remodel existing plumbing · 126 m away
- 515 Monte Vista DrApr 6, 2026Remove and replace drive approach · 128 m away