Recent · latest filing Sep 2025Commercial
700 S Peak St
Dallas, TX 75223
Water meter installation permitted at 700 S Peak St
A City of Dallas commercial plumbing permit indicates a water meter installation at 700 S Peak St. The permit was filed on September 2, 2025.
Summarized from City of Dallas records · updated Sep 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 2, 2025
- since Sep 2, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 700 S Peak St
What is being built at 700 S Peak St in Dallas?
A City of Dallas commercial plumbing permit describes a water meter installation. The record does not specify other construction.
When was the water meter permit filed for 700 S Peak St?
The permit was filed on September 2, 2025.
What is the permit number for 700 S Peak St?
The City of Dallas permit number is COM-PLM-25-001431.
Is 700 S Peak St a new commercial building?
The available record is for a commercial plumbing permit to install a water meter. It does not indicate that a new building is being constructed.
How much will the project at 700 S Peak St cost?
The permit record does not report a project cost.
Also being built nearby
All of 75223- 4224 Ash LnApr 13, 2026Replace 1" double check for potable water to store · 23 m away
- 723 S Peak StApr 24, 2026Gas test · 28 m away
- 4402 Ash LnFeb 26, 2026New metal base and rewire · 118 m away
- 704 Fletcher StJul 7, 2026Demolition existing structure \| 704 fletcher st · 118 m away
- 708 Fletcher StSep 11, 2020Mplete work permit on 1805021091 · 119 m away
- 805 S Peak StNov 9, 2026Maranatha church 2,400 sq ft one-story addition to an existing 3,500 sq ft church (5,900 sq ft total) · 129 m away
- 515 S Peak StDec 10, 2025Gas test · 209 m away
- 4300 Parry AveAug 28, 2025Gas testcertificate of occupancy must be attained before space can be occupied · 233 m away
- 4510 Ash LnOct 11, 20268ft cedar fence · 239 m away
- 803 S Carroll AveNov 26, 2025Gas test for meter release. found leak at water heater gas valve. replaced and is holding pressure · 241 m away
- 4518 Ash LnAug 24, 2026New hvac systems · 252 m away
- 902 S Peak StJun 25, 2025Repair meter base · 262 m away