902 S Peak St
Dallas, TX 75223
Meter base repairs permitted at 902 S Peak St
Two commercial electrical permits at 902 S Peak St cover repairs to a meter base, including one described as damaged. The permits were filed June 20 and June 25, 2025; they do not describe a new building or change of use.
Summarized from City of Dallas records · updated Jun 25, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Jun 25, 2025
- since Jun 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRemove & replace damaged 100 amp service disconnect check interior of lease forcode violations & nec
Remove & replace damaged 100 amp service disconnect check interior of lease forcode violations & nec
City of Dallas permitElectrical (EL) Commercial Alteration$12
Sources: City of Dallas
Questions about 902 S Peak St
What work is happening at 902 S Peak St in Dallas?
City of Dallas permits describe repairs to a meter base at the commercial property. One permit specifies that the meter base was damaged.
When were the meter base repairs permitted at 902 S Peak St?
The two commercial electrical permits were filed June 20 and June 25, 2025.
What are the permit numbers for 902 S Peak St?
The permits are COM-ELC-25-000550, filed June 20, 2025, and COM-ELC-25-000587, filed June 25, 2025.
Is a new building being built at 902 S Peak St?
The available permits describe meter base repairs, not new construction.
What type of permits were filed for 902 S Peak St, Dallas?
Both filings are City of Dallas commercial electrical permits for meter base repairs.
Also being built nearby
All of 75223- 4300 Parry AveAug 28, 2025Gas testcertificate of occupancy must be attained before space can be occupied · 42 m away
- 916 Ann AveSep 1, 20262.5 ton heat pump condenser changeout in the left side yard plus 75 btus air handler changeout in the attic · 118 m away
- 805 S Peak StNov 9, 2026Maranatha church 2,400 sq ft one-story addition to an existing 3,500 sq ft church (5,900 sq ft total) · 133 m away
- 940 S Haskell AveNov 24, 2020Clean & show · 167 m away
- 1014 Ann AveMar 2, 2026Mcr with battery photovoltaic roof mount system12 modules-roof mounted - 4.440 kw dc, 3.480 kw ac · 169 m away
- 723 S Peak StApr 24, 2026Gas test · 237 m away
- 4513 Lindsley AveApr 24, 2026Gas test · 243 m away
- 820 S Carroll AveOct 4, 2026Clean and show · 247 m away
- 803 S Carroll AveNov 26, 2025Gas test for meter release. found leak at water heater gas valve. replaced and is holding pressure · 251 m away
- 708 Fletcher StSep 11, 2020Mplete work permit on 1805021091 · 259 m away
- 704 Fletcher StJul 7, 2026Demolition existing structure \| 704 fletcher st · 262 m away
- 700 S Peak StSep 2, 2025Water meter installation · 262 m away