806 Valencia St
Dallas, TX 75223
806 Valencia St: 1 project on record
City of Dallas lists 1 filing across 1 project at 806 Valencia St, Dallas, TX 75223. The most recent, filed December 7, 2020, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Dec 7, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 7, 2020
- since Dec 7, 2020
- Largest scope
- —
- Listed value
- $62
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 806 Valencia St
What is being built at 806 Valencia St?
The latest filing (City of Dallas permit 2012073012, December 7, 2020) covers sewer relay.
How many permits and filings does 806 Valencia St have?
1 filing across 1 project, from December 7, 2020 to December 7, 2020.
How much is the construction at 806 Valencia St worth?
Permits at this address list about $62 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 806 Valencia St?
Yes. Nearby filings include 815 Valencia St (accessory building to sfd, Nov 10, 2020); 822 Valencia St (gas line for pool heater, Sep 28, 2026); 911 Valencia St (install new hvac system with ductwork, Apr 3, 2026).
How do I get alerts for new permits at 806 Valencia St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 815 Valencia StNov 10, 2020Accessory building to sfd · 13 m away
- 822 Valencia StSep 28, 2026Gas line for pool heater · 25 m away
- 911 Valencia StApr 3, 2026Install new hvac system with ductwork · 95 m away
- 814 Cameron AveJan 21, 2026The house is currently vacant and a gas test needs to be done to get the gas back on · 98 m away
- 818 Cameron AveNov 24, 2020Complete work from previous permit # 1903045002 · 99 m away
- 820 Cameron AveMay 27, 2025Replace 2.5 ton complete gas system · 99 m away
- 710 Valencia StDec 10, 2025Enclosure of existing covered porch that has four (4) open arches leading to the exterior of the house. three (3) of the arches will be enclosed with windows. the remaining arch will be enclosed with an operable door that will serve as the front entrance to the home. the proposed project will not have any structural changes to the home. a secondary change, as shown on the provided drawings, is to remove and enclose an exterior door leading to the master bedroom. the door will be removed and will be filled in with brick to match the existing brick · 102 m away
- 703 Valencia StMay 30, 2025Remove old composition shingles & install new composition shingles · 110 m away
- 911 Cordova StDec 20, 2025Replace gas service · 137 m away
- 915 Cordova StOct 6, 2020Replace water service · 141 m away
- 710 Cordova StSep 25, 2020Install water heater · 144 m away
- 910 Cordova StOct 13, 2020Replace or modify existing hvac · 145 m away