815 Valencia St
Dallas, TX 75223
815 Valencia St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 815 Valencia St, Dallas, TX 75223. The most recent, filed November 10, 2020, covers: “Accessory building to sfd”.
Compiled from City of Dallas records · updated Nov 10, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Nov 10, 2020
- since Nov 10, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 815 Valencia St
What is being built at 815 Valencia St?
The latest filing (City of Dallas permit 2011101119, November 10, 2020) covers accessory building to sfd.
How many permits and filings does 815 Valencia St have?
2 filings across 2 projects, from November 10, 2020 to November 10, 2020.
Is there other construction near 815 Valencia St?
Yes. Nearby filings include 806 Valencia St (sewer relay, Dec 7, 2020); 822 Valencia St (gas line for pool heater, Sep 28, 2026); 814 Cameron Ave (the house is currently vacant and a gas test needs to be done to get the gas back on, Jan 21, 2026).
How do I get alerts for new permits at 815 Valencia St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75223- 806 Valencia StDec 7, 2020Sewer relay · 13 m away
- 822 Valencia StSep 28, 2026Gas line for pool heater · 25 m away
- 814 Cameron AveJan 21, 2026The house is currently vacant and a gas test needs to be done to get the gas back on · 86 m away
- 818 Cameron AveNov 24, 2020Complete work from previous permit # 1903045002 · 86 m away
- 820 Cameron AveMay 27, 2025Replace 2.5 ton complete gas system · 86 m away
- 911 Valencia StApr 3, 2026Install new hvac system with ductwork · 90 m away
- 710 Valencia StDec 10, 2025Enclosure of existing covered porch that has four (4) open arches leading to the exterior of the house. three (3) of the arches will be enclosed with windows. the remaining arch will be enclosed with an operable door that will serve as the front entrance to the home. the proposed project will not have any structural changes to the home. a secondary change, as shown on the provided drawings, is to remove and enclose an exterior door leading to the master bedroom. the door will be removed and will be filled in with brick to match the existing brick · 107 m away
- 703 Valencia StMay 30, 2025Remove old composition shingles & install new composition shingles · 113 m away
- 911 Cordova StDec 20, 2025Replace gas service · 143 m away
- 915 Cordova StOct 6, 2020Replace water service · 147 m away
- 910 Cordova StOct 13, 2020Replace or modify existing hvac · 152 m away
- 710 Cordova StSep 25, 2020Install water heater · 155 m away