2225 W Ledbetter Dr
Dallas, TX 75224
New Suite 100 planned at 2225 W Ledbetter Dr
A commercial alteration permit dated December 15, 2025, describes creating Suite 100 by reducing the size of an existing suite and adding a non-load-bearing partition wall. The permit description says no electrical, plumbing or HVAC work was performed.
Summarized from City of Dallas records · updated Dec 15, 2025
- Projects
- 8
- 8 filings
- Latest filing
- Dec 15, 2025
- since Dec 15, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
8 projectsMcr the proposed project is to create a suite by reducing the size of the existing suite and building a non-load-bearing wall as a separation between the suites, and making the new suite # 100, with no electrical, plumbing, or hvac work having been performed
Mcr the proposed project is to create a suite by reducing the size of the existing suite and building a non-load-bearing wall as a separation between the suites, and making the new suite # 100, with no electrical, plumbing, or hvac work having been performed
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 2225 W Ledbetter Dr
What is being built at 2225 W Ledbetter Dr in Dallas?
A commercial permit describes creating a new suite, numbered 100, by dividing an existing suite with a non-load-bearing wall.
When was the permit filed for 2225 W Ledbetter Dr?
The City of Dallas permit, COM-ALT-ADD-25-001664, is dated December 15, 2025.
Is this a new building at 2225 W Ledbetter Dr?
The permit describes an alteration to an existing suite, not construction of a new building.
What work is planned for Suite 100 at 2225 W Ledbetter Dr?
The project description says the existing suite will be reduced in size and separated from the new Suite 100 by a non-load-bearing wall.
Does the 2225 W Ledbetter Dr permit include electrical, plumbing or HVAC work?
No. The permit description says no electrical, plumbing or HVAC work was performed.
Also being built nearby
All of 75224- 2200 W Ledbetter DrMay 14, 2026Qteam meeting construction of a proposed carwash building with carwash tunnel and office. scope of work includes the paving and drainage, utility, vacuum stations and landscape infrastructure to support the carwash · 29 m away
- 2300 W Ledbetter Dr · Bym Investments LLCApr 24, 2025Slyde's car wash — new construction — a new car wash facility · 84 m away
- 2311 W Ledbetter DrOct 5, 2026Zo bc replace (4) fixtures and add (1) new pole and (1) fixture · 94 m away
- 2334 W Ledbetter DrDec 8, 2025Install electrical for multi tenant sign · 121 m away
- 4427 Alamosa DrSep 29, 2026Install new gas relay yard line and pressure test · 125 m away
- 4115 Druid Hills DrJul 3, 2025Relocate gas meter on behalf of atmos · 191 m away
- 2037 Whitedove DrMar 3, 2026Replace (1) 50 gal water heater · 218 m away
- 2028 Whitedove DrOct 31, 2025Gas test · 224 m away
- 4323 S Hampton Rd · Express Self-Service CarwashMar 12, 2026Installation of 3 30kw heaters and 1 4t split system · 231 m away
- 2023 Whitedove DrOct 13, 2026Mcr with battery teri boyd - installation of a grid tied, roof mounted, solar pv system with an mpu relocate · 234 m away
- 2009 Canelo DrMay 3, 2026Gas test · 238 m away
- 4505 Mark Trail WayOct 8, 2025Gas test service release per atmos energy · 247 m away