Active · latest filing Sep 2026Residential
4427 Alamosa Dr
Dallas, TX 75232
Gas line work permitted at 4427 Alamosa Dr
A residential permit covers installation of a new gas relay yard line and a pressure test at 4427 Alamosa Dr in Dallas. The City of Dallas filed the permit on September 29, 2026.
Summarized from City of Dallas records · updated Sep 29, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 29, 2026
- since Sep 29, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4427 Alamosa Dr
What work is being done at 4427 Alamosa Dr?
A City of Dallas residential plumbing permit covers installation of a new gas relay yard line and a pressure test.
When was the gas line work permitted?
The permit was filed on September 29, 2026.
What is the permit number for 4427 Alamosa Dr?
The permit number is RES-PLM-26-010413.
Is a new home being built at 4427 Alamosa Dr?
The available permit describes gas line installation and pressure testing; it does not describe construction of a new home.
How much will the work at 4427 Alamosa Dr cost?
The permit record does not report a project valuation or cost estimate.
Also being built nearby
All of 75232- 2200 W Ledbetter DrMay 14, 2026Qteam meeting construction of a proposed carwash building with carwash tunnel and office. scope of work includes the paving and drainage, utility, vacuum stations and landscape infrastructure to support the carwash · 104 m away
- 2225 W Ledbetter DrDec 15, 2025Mcr the proposed project is to create a suite by reducing the size of the existing suite and building a non-load-bearing wall as a separation between the suites, and making the new suite # 100, with no electrical, plumbing, or hvac work having been performed · 125 m away
- 4505 Mark Trail WayOct 8, 2025Gas test service release per atmos energy · 134 m away
- 4518 Mark Trail WayJul 16, 2025Replace complete gas system · 149 m away
- 2300 W Ledbetter Dr · Bym Investments LLCApr 24, 2025Slyde's car wash — new construction — a new car wash facility · 167 m away
- 4429 Mark Trail WayOct 14, 2026Replace 3.5 ton heat pump system · 174 m away
- 2231 Myrtlewood DrOct 29, 2026Gas test · 175 m away
- 2009 Canelo DrMay 3, 2026Gas test · 182 m away
- 2311 W Ledbetter DrOct 5, 2026Zo bc replace (4) fixtures and add (1) new pole and (1) fixture · 184 m away
- 2251 Myrtlewood DrAug 19, 2025Changeout condenser 3 tons, indoor coil 3 tons, changeout furnace btus: 66000 · 185 m away
- 4408 Mark Trail WayJul 8, 20261 layer install 3 sheets of decking allowance install synthetic felt install asphalt starter around perimeter of roof install ice and water barrier in valleys install new laminate shingle-30yr manufacturer warranty install duraflow replace heat stack and rain caps paint all metals and flashing to match · 198 m away
- 2334 W Ledbetter DrDec 8, 2025Install electrical for multi tenant sign · 198 m away