6306 Diamond Head Cir
Dallas, TX 75225
Gas meter relocation permitted at 6306 Diamond Head Cir
A City of Dallas commercial plumbing permit indicates a gas meter will be rerouted to a new location at 6306 Diamond Head Cir. The permit, COM-PLM-25-001411, was filed on August 22, 2025.
Summarized from City of Dallas records · updated Aug 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 22, 2025
- since Aug 22, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6306 Diamond Head Cir
What is happening at 6306 Diamond Head Cir?
A City of Dallas commercial plumbing permit indicates work to reroute a gas meter to a new location. The permit was filed August 22, 2025.
Is a new building being built at 6306 Diamond Head Cir?
The available permit record describes gas meter relocation, not construction of a new building.
When was the gas meter permit filed at 6306 Diamond Head Cir?
The City of Dallas filed commercial plumbing permit COM-PLM-25-001411 on August 22, 2025.
What does permit COM-PLM-25-001411 cover?
The permit description says the gas meter will be rerouted to a new location. It is listed as a commercial plumbing permit.
What work is planned near Park Cities Baptist Church Building Level 1 Renovation?
At 6306 Diamond Head Cir, about 205 meters from the listed landmark, a City of Dallas permit indicates gas meter relocation. The permit was filed August 22, 2025.
Also being built nearby
All of 75225- 6345 Diamond Head CirMay 12, 20265ft inside tunnel inside apartment unit a - to repair a water leak · 51 m away
- 6335 W Northwest HwySep 21, 2026Mcr interior renovation of existing condominium unit 1815 including non-structural interior wall modifications, drywall, flooring, kitchen and bath updates, and associated electrical and plumbing only. no change of use · 53 m away
- 6255 W Northwest HwySep 24, 2025Waterproof secondary conduits for building switch gear · 102 m away
- 6306 Bandera AveFeb 21, 2026Interior panel upgrade · 127 m away
- 6320 Bandera AveJun 24, 2026Replace all fpe panels, disconnects, and relocating service disconnects outside with a new 1600 amp trans socket. new ground rods, cold water bond, and intersystem bond. we are setting up four 400amp 1 phase disconnects and 1-200 amp disconnect, 1-60amp 3 phase for the only piece of equipment that needs the high-leg · 133 m away
- 8514 Baltimore DrDec 22, 2025House panel upgrade · 134 m away
- 6307 Bandera AveMar 31, 2026Relocate gas meter · 142 m away
- 6345 Bandera AveApr 1, 2026Relocate gas meter · 175 m away
- 6211 W Northwest HwyNov 5, 2026New shower base install and new shower valve · 193 m away
- 6359 Bandera AveApr 1, 2026Relocate gas meter · 205 m away
- 3933 Northwest Pkwy · Park Cities Baptist ChurchMay 26, 2026Park cities baptist church building level 1 renovation — renovation/alteration — interior reconfiguration of existing level 1 classroom spaces and interior circulation to create six (6) classroom spaces and central common area with new restroom finishes and reconfiguration of existing accessible stalls. existing counseling offic · 205 m away
- 3933 Northwest Parkway · Park Cities Baptist ChurchDec 3, 2024Park cities baptist church memorial garden & columbarium — new construction — park cities baptist church is constructing a 1945 square foot outdoor memorial garden and columbarium on their existing church campus. the structure will be constructed of masonry walls with cast stone caps with decorative metal gates and fencing · 205 m away