Plumbing work filed at 6307 Bandera Ave
City of Dallas records show plumbing work at 6307 Bandera Ave, including a gas meter relocation permitted March 31, 2026. An earlier residential plumbing permit, filed October 30, 2025, covers work on a tub drain and shower valve. The records do not describe a new building or provide a project cost.
Summarized from City of Dallas records · updated Mar 31, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 31, 2026
- since Oct 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplace p trap under tub of exposed drain line in ceiling.install customer supplied shower valve
Replace p trap under tub of exposed drain line in ceiling.install customer supplied shower valve
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 6307 Bandera Ave
What is being built at 6307 Bandera Ave?
The available permits describe plumbing work, not a new building: a gas meter relocation and repairs involving a tub drain and shower valve.
What work was permitted at 6307 Bandera Ave in 2026?
A commercial plumbing permit dated March 31, 2026, lists relocation of a gas meter. The permit number is COM-PLM-26-001230.
What was the 2025 plumbing permit for at 6307 Bandera Ave?
The residential plumbing permit filed October 30, 2025, describes replacing a tub P-trap and installing a customer-supplied shower valve. Its number is RES-PLM-25-006735.
Is a new commercial building planned at 6307 Bandera Ave?
The records provided list two plumbing permits and do not describe a new commercial building.
When were permits filed for 6307 Bandera Ave?
The two City of Dallas permit filings are dated October 30, 2025, and March 31, 2026.
Also being built nearby
All of 75225- 6306 Bandera AveFeb 21, 2026Interior panel upgrade · 17 m away
- 6320 Bandera AveJun 24, 2026Replace all fpe panels, disconnects, and relocating service disconnects outside with a new 1600 amp trans socket. new ground rods, cold water bond, and intersystem bond. we are setting up four 400amp 1 phase disconnects and 1-200 amp disconnect, 1-60amp 3 phase for the only piece of equipment that needs the high-leg · 93 m away
- 6224 Del Norte LnMar 3, 2026Relocate gas meter · 124 m away
- 6304 Del Norte LnJun 29, 2026Installation of lighting, switches, plugs and meter base · 126 m away
- 6310 Del Norte LnMar 24, 2026Residential roof mounted solar · 134 m away
- 6305 Del Norte LnJan 14, 2021Demolition sfd · 136 m away
- 6255 W Northwest HwySep 24, 2025Waterproof secondary conduits for building switch gear · 139 m away
- 6306 Diamond Head CirAug 22, 2025Reroute gas meter to new location for atmos · 142 m away
- 6311 Del Norte LnMar 11, 2026We added a pool equipment cover fence22 linear ft to the back28 linear ft on the side4 ft long walk gate in the front · 143 m away
- 6345 Bandera AveApr 1, 2026Relocate gas meter · 146 m away
- 6322 Del Norte LnFeb 23, 2026Yard sewer line replacement · 151 m away
- 6345 Diamond Head CirMay 12, 20265ft inside tunnel inside apartment unit a - to repair a water leak · 153 m away