7037 Chipperton Dr
Dallas, TX 75225
New single-family home permitted at 7037 Chipperton Dr
A new single-family home is planned at 7037 Chipperton Dr, according to a City of Dallas new-construction permit filed June 18, 2026. A demolition permit filed March 10, 2026, covers removal of all structures on the property. Later permits cover residential plumbing and electrical work.
Summarized from City of Dallas records · updated Sep 11, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 11, 2026
- since Mar 10, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projects7037 chipperton dr - demolition all structures on property. utilities will be shutoff and capped prior to demolition
7037 chipperton dr - demolition all structures on property. utilities will be shutoff and capped prior to demolition
City of Dallas permitResidential Demolition Permit
Sources: City of Dallas
Questions about 7037 Chipperton Dr
What is being built at 7037 Chipperton Dr?
City of Dallas records indicate a new single-family home. The new-construction permit, RES-NEW-26-001076, was filed June 18, 2026.
Was a building demolished at 7037 Chipperton Dr?
A City of Dallas demolition permit filed March 10, 2026, covers demolition of all structures on the property. The permit number is RES-DEM-26-000178.
When was the new home at 7037 Chipperton Dr permitted?
The new residential construction permit was filed June 18, 2026. It is listed as RES-NEW-26-001076.
Are there plumbing permits for 7037 Chipperton Dr?
Yes. A residential plumbing permit for rough-in, top-out, gas service and fixture installation was filed August 14, 2026. Its number is RES-PLM-26-008609.
Are there electrical permits for 7037 Chipperton Dr?
Yes. A permit for the new-construction electrical system, service and slab work was filed September 11, 2026. Its number is RES-ELC-26-005586.
Is 7037 Chipperton Dr a new home or a commercial project?
The records classify the project as residential and describe a new single-family dwelling. They do not indicate a commercial project.
Also being built nearby
All of 75225- 7020 Chipperton DrJan 28, 2021Install new hvac · 38 m away
- 6931 Stefani DrAug 15, 2025Scope of workinstall a 3-ton vertical upflow lennox gas furnace system in the attic. the work includes replacing the condenser, matched coil, furnace, thermostat, and installing filtration. this job will include essential modifications such as running a new pvc concentric vent to the exterior. installed in: attic · 80 m away
- 6924 Stefani DrNov 10, 2025Run gas line to generator · 81 m away
- 6937 Stefani DrJun 4, 2025Remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment · 81 m away
- 6915 Stefani DrDec 16, 2020Gas relay or repair with test · 85 m away
- 6939 Lupton DrDec 2, 2020Backup generator · 98 m away
- 6936 Lupton DrMar 23, 2026Electrical for remodel · 110 m away
- 6918 Lupton DrSep 1, 2026Install new 50 gallon gas water heater · 117 m away
- 6905 Lupton DrJun 20, 2025Tear off and re-shingle with oc duration storm onyx black · 119 m away
- 7018 Stefani DrAug 24, 2026Remove old composition shingles and install new composition shingles · 128 m away
- 7015 Lupton DrJan 13, 2021Interior/exterior remodel · 130 m away
- 7011 Stefani DrDec 30, 2020Sewer relay · 135 m away