6937 Stefani Dr
Dallas, TX 75225
6937 Stefani Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 6937 Stefani Dr, Dallas, TX 75225. The most recent, filed June 4, 2025, covers: “Remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment”.
Compiled from City of Dallas records · updated Jun 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2025
- since Jun 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRemove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment
Remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment
City of Dallas permitResidential Roofing Permit
Sources: City of Dallas
Questions about 6937 Stefani Dr
What is being built at 6937 Stefani Dr?
The latest filing (City of Dallas permit RES-ROOF-25-000243, June 4, 2025) covers remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment.
How many permits and filings does 6937 Stefani Dr have?
1 filing across 1 project, from June 4, 2025 to June 4, 2025.
Is there other construction near 6937 Stefani Dr?
Yes. Nearby filings include 6931 Stefani Dr (scope of workinstall a 3-ton vertical upflow lennox gas furnace system in the attic. the work includes replacing the condenser, matched coil, furnace, thermostat, and installing filtration. this job will include essential modifications such as running a new pvc concentric vent to the exterior. installed in: attic, Aug 15, 2025); 6915 Stefani Dr (gas relay or repair with test, Dec 16, 2020); 6924 Stefani Dr (run gas line to generator, Nov 10, 2025).
How do I get alerts for new permits at 6937 Stefani Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75225- 6931 Stefani DrAug 15, 2025Scope of workinstall a 3-ton vertical upflow lennox gas furnace system in the attic. the work includes replacing the condenser, matched coil, furnace, thermostat, and installing filtration. this job will include essential modifications such as running a new pvc concentric vent to the exterior. installed in: attic · 10 m away
- 6915 Stefani DrDec 16, 2020Gas relay or repair with test · 35 m away
- 6924 Stefani DrNov 10, 2025Run gas line to generator · 50 m away
- 7037 Chipperton DrSep 11, 2026Installation of new construction electrical system with service and slab work · 81 m away
- 6920 Joyce WayFeb 10, 2026Install new fence and gate, approx. 8 linear feet in total, 8ft tall cedar picket with galvanized steel posts · 100 m away
- 6930 Joyce WayJun 25, 2026Replace the existing hvac system with a new lennox heating and cooling system · 104 m away
- 6919 Joyce WayJan 16, 20261. remove the existing roof. 2. replace rotten decking as needed - up to 2 (4x8) sheets included. 3. install ice and water shields in valleys, around penetrations, and on all slopes below 3/12. 4. install synthetic underlayment to all slopes 3/12 and over. 5. remove and replace drip edges from eaves and rakes. 6. install starter shingles to eaves and rakes to manufacturer's specifications. 7. replace jacks and boots as needed. 8. paint jacks and vents to match the roof. 9. counter flash chimney and/or wall abutments as needed. 10. install valley shingles using half-cut method. 11. install shingles using 6 nails per shingle and to the manufacturer's specifications. 12. remove all debris and trash from worksite upon completion of the project, including a sweep of the area with a magnet. 13. this price includes materials, labor, and equipment needed to complete the project · 113 m away
- 6909 Joyce WayJun 18, 2025Install 80 feet of 4 inch pvc sewer pipe from house to street tap · 113 m away
- 7020 Chipperton DrJan 28, 2021Install new hvac · 114 m away
- 6960 Joyce WayJun 4, 2026Install plumbing for new construction sfd · 117 m away
- 7011 Stefani DrDec 30, 2020Sewer relay · 122 m away
- 7018 Stefani DrAug 24, 2026Remove old composition shingles and install new composition shingles · 124 m away