6960 Joyce Way
Dallas, TX 75225
New single-family home permitted at 6960 Joyce Way
Dallas permits show a house demolition at 6960 Joyce Way on July 16, 2025, followed by a permit for new single-family construction on September 25, 2025. Later permits cover electrical, plumbing and HVAC work, with the latest plumbing permit filed June 4, 2026.
Summarized from City of Dallas records · updated Jun 4, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Jun 4, 2026
- since Jul 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
6 projectsSources: City of Dallas
Questions about 6960 Joyce Way
What is being built at 6960 Joyce Way?
Dallas records indicate a new single-family home is being built. The city issued a residential new-construction permit, RES-NEW-25-000517, on September 25, 2025.
Was the existing house at 6960 Joyce Way demolished?
A City of Dallas demolition permit, RES-DEM-25-000237, was filed on July 16, 2025, for a house demolition.
When was the new home at 6960 Joyce Way permitted?
The residential new-construction permit was filed September 25, 2025. The city later recorded electrical, plumbing and mechanical permits.
What work has been permitted at 6960 Joyce Way?
Records include a demolition permit and permits for new single-family construction, electrical work, plumbing and HVAC installation. The latest listed permit is for plumbing, filed June 4, 2026, under RES-PLM-26-005774.
Is a new house being built at 6960 Joyce Way in Dallas?
City of Dallas records indicate new single-family construction at the address. Permit RES-NEW-25-000517 was filed September 25, 2025, after a house demolition permit filed July 16, 2025.
Also being built nearby
All of 75225- 6949 Joyce WaySep 12, 2025Foundation repair-install 4 piers · 27 m away
- 6930 Joyce WayJun 25, 2026Replace the existing hvac system with a new lennox heating and cooling system · 53 m away
- 6920 Joyce WayFeb 10, 2026Install new fence and gate, approx. 8 linear feet in total, 8ft tall cedar picket with galvanized steel posts · 71 m away
- 6919 Joyce WayJan 16, 20261. remove the existing roof. 2. replace rotten decking as needed - up to 2 (4x8) sheets included. 3. install ice and water shields in valleys, around penetrations, and on all slopes below 3/12. 4. install synthetic underlayment to all slopes 3/12 and over. 5. remove and replace drip edges from eaves and rakes. 6. install starter shingles to eaves and rakes to manufacturer's specifications. 7. replace jacks and boots as needed. 8. paint jacks and vents to match the roof. 9. counter flash chimney and/or wall abutments as needed. 10. install valley shingles using half-cut method. 11. install shingles using 6 nails per shingle and to the manufacturer's specifications. 12. remove all debris and trash from worksite upon completion of the project, including a sweep of the area with a magnet. 13. this price includes materials, labor, and equipment needed to complete the project · 79 m away
- 6909 Joyce WayJun 18, 2025Install 80 feet of 4 inch pvc sewer pipe from house to street tap · 96 m away
- 7018 Joyce WayJun 8, 2026Tunnel and replace kitchen and toilet lateral · 110 m away
- 6937 Stefani DrJun 4, 2025Remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment · 117 m away
- 6931 Stefani DrAug 15, 2025Scope of workinstall a 3-ton vertical upflow lennox gas furnace system in the attic. the work includes replacing the condenser, matched coil, furnace, thermostat, and installing filtration. this job will include essential modifications such as running a new pvc concentric vent to the exterior. installed in: attic · 123 m away
- 7011 Stefani DrDec 30, 2020Sewer relay · 130 m away
- 7018 Stefani DrAug 24, 2026Remove old composition shingles and install new composition shingles · 141 m away
- 6915 Stefani DrDec 16, 2020Gas relay or repair with test · 141 m away
- 7023 Stefani DrAug 3, 2026Install a new air conditioning and heating system with ductwork · 145 m away