6949 Joyce Way
Dallas, TX 75225
6949 Joyce Way: 1 project on record
City of Dallas lists 1 filing across 1 project at 6949 Joyce Way, Dallas, TX 75225. The most recent, filed September 12, 2025, covers: “Foundation repair-install 4 piers”.
Compiled from City of Dallas records · updated Sep 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 12, 2025
- since Sep 12, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6949 Joyce Way
What is being built at 6949 Joyce Way?
The latest filing (City of Dallas permit RES-FDN-25-000457, September 12, 2025) covers foundation repair-install 4 piers.
How many permits and filings does 6949 Joyce Way have?
1 filing across 1 project, from September 12, 2025 to September 12, 2025.
Is there other construction near 6949 Joyce Way?
Yes. Nearby filings include 6960 Joyce Way (install plumbing for new construction sfd, Jun 4, 2026); 6930 Joyce Way (replace the existing hvac system with a new lennox heating and cooling system, Jun 25, 2026); 6920 Joyce Way (install new fence and gate, approx. 8 linear feet in total, 8ft tall cedar picket with galvanized steel posts, Feb 10, 2026).
How do I get alerts for new permits at 6949 Joyce Way?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75225- 6960 Joyce WayJun 4, 2026Install plumbing for new construction sfd · 27 m away
- 6930 Joyce WayJun 25, 2026Replace the existing hvac system with a new lennox heating and cooling system · 35 m away
- 6920 Joyce WayFeb 10, 2026Install new fence and gate, approx. 8 linear feet in total, 8ft tall cedar picket with galvanized steel posts · 54 m away
- 6919 Joyce WayJan 16, 20261. remove the existing roof. 2. replace rotten decking as needed - up to 2 (4x8) sheets included. 3. install ice and water shields in valleys, around penetrations, and on all slopes below 3/12. 4. install synthetic underlayment to all slopes 3/12 and over. 5. remove and replace drip edges from eaves and rakes. 6. install starter shingles to eaves and rakes to manufacturer's specifications. 7. replace jacks and boots as needed. 8. paint jacks and vents to match the roof. 9. counter flash chimney and/or wall abutments as needed. 10. install valley shingles using half-cut method. 11. install shingles using 6 nails per shingle and to the manufacturer's specifications. 12. remove all debris and trash from worksite upon completion of the project, including a sweep of the area with a magnet. 13. this price includes materials, labor, and equipment needed to complete the project · 58 m away
- 6909 Joyce WayJun 18, 2025Install 80 feet of 4 inch pvc sewer pipe from house to street tap · 75 m away
- 6937 Stefani DrJun 4, 2025Remove existing asphalt shingles and install new asphalt shingles. installing atlas pinnacle pristine in the black shadow color. ice and water valley protection and synthetic underlayment · 124 m away
- 6931 Stefani DrAug 15, 2025Scope of workinstall a 3-ton vertical upflow lennox gas furnace system in the attic. the work includes replacing the condenser, matched coil, furnace, thermostat, and installing filtration. this job will include essential modifications such as running a new pvc concentric vent to the exterior. installed in: attic · 129 m away
- 7018 Joyce WayJun 8, 2026Tunnel and replace kitchen and toilet lateral · 134 m away
- 6915 Stefani DrDec 16, 2020Gas relay or repair with test · 143 m away
- 7011 Stefani DrDec 30, 2020Sewer relay · 155 m away
- 6924 Stefani DrNov 10, 2025Run gas line to generator · 160 m away
- 7018 Stefani DrAug 24, 2026Remove old composition shingles and install new composition shingles · 166 m away