City of Dallas lists 1 filing across 1 project at 6909 Joyce Way, Dallas, TX 75225. The most recent, filed June 18, 2025, covers: “Install 80 feet of 4 inch pvc sewer pipe from house to street tap”.

Compiled from City of Dallas records · updated Jun 18, 2025

Projects
1
1 filings
Latest filing
Jun 18, 2025
since Jun 18, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Install 80 feet of 4 inch pvc sewer pipe from house to street tap

    Install 80 feet of 4 inch pvc sewer pipe from house to street tap

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-25-001621
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6909 Joyce Way

What is being built at 6909 Joyce Way?

The latest filing (City of Dallas permit RES-PLM-25-001621, June 18, 2025) covers install 80 feet of 4 inch pvc sewer pipe from house to street tap.

How many permits and filings does 6909 Joyce Way have?

1 filing across 1 project, from June 18, 2025 to June 18, 2025.

Is there other construction near 6909 Joyce Way?

Yes. Nearby filings include 6919 Joyce Way (1. remove the existing roof. 2. replace rotten decking as needed - up to 2 (4x8) sheets included. 3. install ice and water shields in valleys, around penetrations, and on all slopes below 3/12. 4. install synthetic underlayment to all slopes 3/12 and over. 5. remove and replace drip edges from eaves and rakes. 6. install starter shingles to eaves and rakes to manufacturer's specifications. 7. replace jacks and boots as needed. 8. paint jacks and vents to match the roof. 9. counter flash chimney and/or wall abutments as needed. 10. install valley shingles using half-cut method. 11. install shingles using 6 nails per shingle and to the manufacturer's specifications. 12. remove all debris and trash from worksite upon completion of the project, including a sweep of the area with a magnet. 13. this price includes materials, labor, and equipment needed to complete the project, Jan 16, 2026); 6920 Joyce Way (install new fence and gate, approx. 8 linear feet in total, 8ft tall cedar picket with galvanized steel posts, Feb 10, 2026); 6930 Joyce Way (replace the existing hvac system with a new lennox heating and cooling system, Jun 25, 2026).

How do I get alerts for new permits at 6909 Joyce Way?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75225
Get alerts for 6909 Joyce Way