8505 Douglas Ave
Dallas, TX 75225
8505 Douglas Ave: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 8505 Douglas Ave, Dallas, TX 75225. The most recent, filed October 23, 2020, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Oct 23, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Oct 23, 2020
- since Oct 23, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8505 Douglas Ave
What is being built at 8505 Douglas Ave?
The latest filing (City of Dallas permit 2010231014, October 23, 2020) covers erect attached sign.
How many permits and filings does 8505 Douglas Ave have?
2 filings across 2 projects, from October 23, 2020 to October 23, 2020.
What is being built near Hbt Partners in Dallas?
8505 Douglas Ave is about 129 m from Hbt Partners (6019 Berkshire Lane). Its latest filing is for erect attached sign.
Is there other construction near 8505 Douglas Ave?
Yes. Nearby filings include 6009 Berkshire Ln (replace gb3 grease interceptor 50 gpm / 75 gpm, 4" fpt inlet/outlet, with 4" plain end fitting adapters and pedestrian rated cover, Sep 23, 2025); 6019 Berkshire Lane (harry bock co remodel — renovation/alteration — this project involves the interior renovation of the second level of the bachendorf office in dallas, texas, including upgrades to the existing conference room, offices, and shared spaces, May 28, 2025); 6019 Berkshire Ln (install plumbing system for 3 new rest rooms and 1 mop sink, Jun 5, 2026).
How do I get alerts for new permits at 8505 Douglas Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75225- 6009 Berkshire LnSep 23, 2025Replace gb3 grease interceptor 50 gpm / 75 gpm, 4" fpt inlet/outlet, with 4" plain end fitting adapters and pedestrian rated cover · 104 m away
- 6019 Berkshire Lane · Hbt Partners LPMay 28, 2025Harry bock co remodel — renovation/alteration — this project involves the interior renovation of the second level of the bachendorf office in dallas, texas, including upgrades to the existing conference room, offices, and shared spaces · 129 m away
- 6019 Berkshire LnJun 5, 2026Install plumbing system for 3 new rest rooms and 1 mop sink · 129 m away
- 5960 Berkshire LnJun 5, 2026Install breakroom sink · 142 m away
- 5960 Berkshire Lane · Gpihrlp Terraces LPApr 30, 2026Janney — renovation/alteration — 2,774 sq ft · 142 m away
- 5960 Berkshire Lane 5th · Cio Terraces, LLCDec 9, 2025Berkadia expansion — renovation/alteration — interior renovation in high rise office building · 142 m away
- 6033 Berkshire LnNov 17, 2026Interior remodel existing service plugs lights · 153 m away
- 5840 W Northwest HwyMay 5, 2025Remove existing roof ballast material from existing 5,200 sq ft built-up roof, we are not demolition'ing existing roof system.roof recover only, approx. 5,200 sq ft · 157 m away
- 5950 Berkshire LnDec 11, 2025New vav box, supply and return grilles and diffusers and associated ductwork. also, new computer room a/c unit · 159 m away
- 5950 Berkshire Lane 16th · Fhf I Berkshire Tower LLCSep 26, 2024Umb dallas office renovation — renovation/alteration — the project consists of interior renovation of entire 16h floor area ( 9,000 +/- sq ft). the interior of existing space is already cleared out and only new work is to occur. the space will include offices, conference rooms and break area · 159 m away
- 5950 Berkshire Lane · Fhf I Berkshire Tower LLCOct 14, 2025Riverside company — renovation/alteration — tenant improvement · 159 m away
- 8343 Douglas AveOct 9, 2026Emergency repair of the existing electrical feeder serving the fire pump from the utility transformer. remove and replace the failed lb conduit body, re-pull/reconnect existing feeder conductors as required, and test and verify proper electrical operation prior to re-energization · 175 m away