2708 Elm St
Dallas, TX 75226
2708 Elm St: 1 project on record
City of Dallas lists 1 filing across 1 project at 2708 Elm St, Dallas, TX 75226. The most recent, filed January 4, 2021, covers: “Erect attached sign”.
Compiled from City of Dallas records · updated Jan 4, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 4, 2021
- since Jan 4, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 2708 Elm St
What is being built at 2708 Elm St?
The latest filing (City of Dallas permit 2012281025, January 4, 2021) covers erect attached sign.
How many permits and filings does 2708 Elm St have?
1 filing across 1 project, from January 4, 2021 to January 4, 2021.
What is being built near Na in Dallas?
2708 Elm St is about 14 m from Na (2713 Elm St). Its latest filing is for erect attached sign.
Is there other construction near 2708 Elm St?
Yes. Nearby filings include 2711 Elm St (gas test pressure test, Jan 5, 2026); 2713 Elm St (meter release, Sep 24, 2026); 2724 Elm St (gas test, Apr 7, 2026).
How do I get alerts for new permits at 2708 Elm St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75226- 2711 Elm StJan 5, 2026Gas test pressure test · 13 m away
- 2713 Elm StSep 24, 2026Meter release · 14 m away
- 2724 Elm StApr 7, 2026Gas test · 22 m away
- 2723 Elm StAug 4, 2026Remplacement 2 rpz valves · 23 m away
- 2649 Main StJan 6, 2021Erect attached sign · 85 m away
- 2656 Main StNov 24, 2025This is a clean & show only · 88 m away
- 2701 Main Street · Deep EllumOct 22, 2024Triple cards, deep ellum — renovation/alteration — renovation of restrooms, lighting, adding a conference room, finishes · 94 m away
- 2650 Main StSep 15, 2026Tie the existing sewer for kettle art, and taboo tattoo together, and reroute that discharge from both suites to a tap presume to be located in front of taboo tattoo. excavate approximately 120 feet of sewer trench, 2 to 4 foot deep to install the new sewer piping. it will also include up the 15 feet of tunneling to reach into the kettle art suite from taboo tattoo to redirect its sewer, as well as reach out under the front of taboo tattoo and onto the city provided sewer tap underneath the sidewalk. all installed piping will be scheduled 40 pvc, and will be installed during normal business hours · 94 m away
- 2638 Elm StJul 18, 2025Gas test only for gas meter release · 95 m away
- 2639 Elm Street · Elm Street Lofts, Ltd. Westdale Asset ManagementFeb 5, 2024The boil daddy deep ellum — renovation/alteration — minor interior remodeling of existing restaurant space for a new restaurant · 96 m away
- 2707 Main StMar 2, 2026Gas inspection · 96 m away
- 2707 Main Street · Wings By The PoundNov 9, 2026Wings by the pound — renovation/alteration — removed all old wall vinyl, including adhesive residue, and prepped surfaces for new application. supplied and installed new custom- design wall vinyl with precise alignment, seam matching, and finish touch-ups for a clean, uniform final appearance · 96 m away