3202 Canton St
Dallas, TX 75226 · City Of Dallas - Facilities & Real Estate
Restroom upgrades and building repairs at 3202 Canton St
City of Dallas permits indicate restroom renovations and building repairs at 3202 Canton St. Filings from May 15, 2025, through May 29, 2026, include electrical work for lighting and self-flushing toilets, replacement exhaust fans, a gas test, and roof replacement.
Summarized from City of Dallas, Texas Department of Licensing and Regulation records · updated May 29, 2026
- Projects
- 7
- 7 filings
- Latest filing
- May 29, 2026
- since Mar 13, 2025
- Largest scope
- 2,022 sf
- Estimated cost
- $250K
- state registration
Permit & project history
7 projectsDemoing existing electrical and installing new boxes, wiring, and breakers for dedicated circuits for lighting and self flush toilets
Demoing existing electrical and installing new boxes, wiring, and breakers for dedicated circuits for lighting and self flush toilets
City of Dallas permitCommercial Electrical PermitRemove existing toilet facilities and provide new up to date toilet facilities. — 3202 canton st
TDLR project registrationRenovation/AlterationInspection Complete2,022 sq ft$250K est.- Project #
- TABS2025014144
- Tenant / owner
- Restroom Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: City of Dallas · Texas Department of Licensing and Regulation
Questions about 3202 Canton St
What is being built at 3202 Canton St in Dallas?
City permits indicate renovations and repairs, not a new building. The records include restroom work, electrical upgrades, exhaust fan replacement, a gas test, and roof replacement.
What restroom work is planned at 3202 Canton St?
A May 15, 2025, commercial alteration permit lists men's and women's restroom renovations. A related plumbing permit for restroom renovation was filed May 28, 2025 (COM-PLM-25-000259).
When was the roof permit filed for 3202 Canton St?
The City of Dallas filed commercial roofing permit COM-ROOF-26-000120 on May 29, 2026. Its description says to remove and replace the roof.
What electrical upgrades are happening at 3202 Canton St?
A May 19, 2025, electrical permit describes removing existing electrical work and installing boxes, wiring, and breakers for dedicated lighting and self-flushing toilet circuits.
Are exhaust fans being replaced at 3202 Canton St?
Yes. A commercial mechanical permit filed July 4, 2025 (COM-MEC-25-000307), lists replacement of two exhaust fans.
What work is happening near Klegburg-Rylie Library?
Permits for 3202 Canton St, listed near Klegburg-Rylie Library, show restroom renovations and building repairs. The latest listed permit is for roof replacement, filed May 29, 2026.
Also being built nearby
All of 75226- 1301 Edd Road, Dallas Texas, 75253 3202 Canton Street · City Of DallasSep 30, 2026Klegburg-rylie library interior restoration — additions to existing building — renovating carpet, new ceiling tile, new finishes throughout
- 3209 Canton StJun 18, 2026Gas pressure test · 14 m away
- 334 S Hall StSep 2, 2025We will replace the pvc main sewer lines throughout the building. the focus will be on the men's and women's restrooms, as the existing lines have developed bellies and branch connections that are not draining properly and will reconnect all fixtures into the new sewer lines · 107 m away
- 267 S Hall StNov 5, 2025Install rr exhaust ventilation and supply · 116 m away
- 333 S Hall StJan 28, 2026Gas repair · 169 m away
- 3201 Main StAug 20, 2026Install a sanitary sewer lateral, a 2" irrigation service and a 6" domestic water supply combo with fireline · 196 m away
- 3300 Main StJul 30, 2026Gas test · 198 m away
- 3306 Main StJun 15, 2026Qteam meeting 7.8.26 (all day) **meeting cancelled per applicant’s request*** a construct new 2-story addition on top of exisitng first floor and remodel existing vacant floor space first floor adding 16-untis to the existing 35 unit multifamily dwelling building. no paving or grading proposed · 200 m away
- 3102 Main StDec 7, 2020Install type ii vent-a-hood · 210 m away
- 3035 Canton Street · 3035 Canton Street LLCFeb 7, 2024Peach cobbler factory — additions to existing building — will be using this suite for a dessert location buildout of the peach cobbler factory · 216 m away
- 3035 Canton StJan 29, 2026Gas installations for three rt units on roof top · 216 m away
- 400 S Hall StJul 24, 2025Plug install for sink and lights · 218 m away