3510 S Buckner Blvd
Dallas, TX 75227
Proposed auto service center at 3510 S Buckner Blvd
A permit filed September 23, 2026, describes an interior remodel and a detached structure for a proposed auto service center for wheel and tire services. The new structure is planned to have electrical and mechanical work, with no plumbing listed. The City of Dallas record does not provide a project valuation or square footage.
Summarized from City of Dallas records · updated Sep 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 23, 2026
- since Sep 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectInterior remodel of existing space and addition of detached structure for proposed auto service center business (wheels/tires services). the new structure will have electrical and mechanical (no plumbing)
Interior remodel of existing space and addition of detached structure for proposed auto service center business (wheels/tires services). the new structure will have electrical and mechanical (no plumbing)
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3510 S Buckner Blvd
What is being built at 3510 S Buckner Blvd?
A City of Dallas permit describes an interior remodel of an existing space and a detached structure for a proposed auto service center offering wheel and tire services.
When was the permit filed for 3510 S Buckner Blvd?
The permit was filed September 23, 2026. Its number is COM-ALT-ADD-26-002337.
Is a tire or wheel service center planned at 3510 S Buckner Blvd?
The permit describes a proposed auto service center for wheel and tire services. It does not provide an opening date.
What work does permit COM-ALT-ADD-26-002337 cover?
It covers an interior remodel of existing space and an addition of a detached structure. The record lists electrical and mechanical work, with no plumbing, for the new structure.
What is being planned near St. Philip St. Augustine at 8151 Military Pkwy?
At 3510 S Buckner Blvd, about 423 meters away, a September 23, 2026, permit describes a remodel and detached structure for a proposed wheel and tire service center.
Also being built nearby
All of 75227- 3516 N Buckner BlvdOct 21, 2025Install rpz on soda fountain · 4 m away
- 3530 N Buckner BlvdFeb 9, 2026Extension front metal building 44’x72’ · 13 m away
- 8096 Norvell DrSep 11, 2025Installing new traffic signals and side walks at intersection of s buckner blvd @ jennie lee ln · 142 m away
- 3608 S Buckner BlvdNov 15, 2026Mcr install 10ft fence on property · 158 m away
- 3625 S Buckner BlvdSep 23, 2025Checked over plugs and lights for compliance · 166 m away
- 3636 N Buckner BlvdApr 20, 2026Permit for installation of new paved fire lane · 172 m away
- 3650 N Buckner BlvdDec 10, 2025Gas test · 179 m away
- 8008 Norvell DrSep 14, 2020Cell tower equipment/ antenna upgrade · 204 m away
- 3707 N Buckner BlvdJan 12, 2021Upgrade to antennas and battery cabinets · 208 m away
- 3717 S Buckner BlvdJul 16, 2025Adding a canopy for shade com-alt-add-25-000096 · 213 m away
- 8202 Norvell DrAug 18, 2025Nsfaa-8202 norvell drive, carport addition · 302 m away
- 7917 Norvell DrJul 2, 2026Installing new outlets and switches · 307 m away