3650 N Buckner Blvd

Dallas, TX 75228

Electrical service upgrades and a gas test at 3650 N Buckner Blvd

Dallas permits show electrical service equipment replacement and installation of a generator docking station at 3650 N Buckner Blvd. The electrical permit was filed June 4, 2025, and a gas-test permit followed on December 10, 2025; the records do not describe a new building.

Summarized from City of Dallas records · updated Dec 10, 2025

Projects
4
4 filings
Latest filing
Dec 10, 2025
since Dec 29, 2020
Largest scope
—
Listed value
$75
partial · often understated

Permit & project history

4 projects
  1. Gas test

    Gas test

    City of Dallas permitCommercial Plumbing Permit
    Record
    COM-PLM-25-003109
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Remove and replace existing 600 amp 3 pole nema 3r disconnect that is damaged. however, we will need to relocate via underground from oncor transocket because of not having enough space and working clearance. the disconnect we are installing is a cutler hammer manual transfer switch that is service entrance rated. beside the newly relocated disconnect / manual transfer switch, we will install a 600 amp main circuit breaker, 65k rated, trystar generator docking station. provide proper labeling on all exterior equipment. this work will have to be done on saturday night and sunday due to the fact that we have patients here 3 shifts a day, monday - saturday

    Remove and replace existing 600 amp 3 pole nema 3r disconnect that is damaged. however, we will need to relocate via underground from oncor transocket because of not having enough space and working clearance. the disconnect we are installing is a cutler hammer manual transfer switch that is service entrance rated. beside the newly relocated disconnect / manual transfer switch, we will install a 600 amp main circuit breaker, 65k rated, trystar generator docking station. provide proper labeling on all exterior equipment. this work will have to be done on saturday night and sunday due to the fact that we have patients here 3 shifts a day, monday - saturday

    City of Dallas permitCommercial Electrical Permit
    Record
    COM-ELC-25-000233
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Interior remodel only

    Interior remodel only

    City of Dallas permitBuilding (BU) Commercial Renovation$75
    Record
    2012281042
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Complete scope of work from permit 1709121155

    Complete scope of work from permit 1709121155

    City of Dallas permitBuilding (BU) Commercial Renovation$2
    Record
    1912301012
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 3650 N Buckner Blvd

What is being built at 3650 N Buckner Blvd in Dallas?

The permits describe electrical service equipment work, including a generator docking station, and a gas test. They do not identify a new building.

What electrical work is permitted at 3650 N Buckner Blvd?

Permit COM-ELC-25-000233, filed June 4, 2025, covers replacing a damaged 600-amp disconnect, relocating it underground, and installing a 600-amp main circuit breaker and generator docking station.

Was a gas test permitted at 3650 N Buckner Blvd?

Yes. Dallas issued a commercial plumbing permit for a gas test on December 10, 2025, under permit COM-PLM-25-003109.

When were permits filed for work at 3650 N Buckner Blvd?

The earliest listed filing was the electrical permit on June 4, 2025. The latest was the gas-test permit on December 10, 2025.

What work is happening near St. Philip St. Augustine - Phase 3?

The permitted work at 3650 N Buckner Blvd includes electrical service equipment replacement, a generator docking station, and a gas test. The address is listed about 310 meters from St. Philip St. Augustine - Phase 3 at 8151 Military Pkwy.