3650 N Buckner Blvd
Dallas, TX 75228
Electrical service upgrades and a gas test at 3650 N Buckner Blvd
Dallas permits show electrical service equipment replacement and installation of a generator docking station at 3650 N Buckner Blvd. The electrical permit was filed June 4, 2025, and a gas-test permit followed on December 10, 2025; the records do not describe a new building.
Summarized from City of Dallas records · updated Dec 10, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Dec 10, 2025
- since Dec 29, 2020
- Largest scope
- —
- Listed value
- $75
- partial · often understated
Permit & project history
4 projectsRemove and replace existing 600 amp 3 pole nema 3r disconnect that is damaged. however, we will need to relocate via underground from oncor transocket because of not having enough space and working clearance. the disconnect we are installing is a cutler hammer manual transfer switch that is service entrance rated. beside the newly relocated disconnect / manual transfer switch, we will install a 600 amp main circuit breaker, 65k rated, trystar generator docking station. provide proper labeling on all exterior equipment. this work will have to be done on saturday night and sunday due to the fact that we have patients here 3 shifts a day, monday - saturday
Remove and replace existing 600 amp 3 pole nema 3r disconnect that is damaged. however, we will need to relocate via underground from oncor transocket because of not having enough space and working clearance. the disconnect we are installing is a cutler hammer manual transfer switch that is service entrance rated. beside the newly relocated disconnect / manual transfer switch, we will install a 600 amp main circuit breaker, 65k rated, trystar generator docking station. provide proper labeling on all exterior equipment. this work will have to be done on saturday night and sunday due to the fact that we have patients here 3 shifts a day, monday - saturday
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 3650 N Buckner Blvd
What is being built at 3650 N Buckner Blvd in Dallas?
The permits describe electrical service equipment work, including a generator docking station, and a gas test. They do not identify a new building.
What electrical work is permitted at 3650 N Buckner Blvd?
Permit COM-ELC-25-000233, filed June 4, 2025, covers replacing a damaged 600-amp disconnect, relocating it underground, and installing a 600-amp main circuit breaker and generator docking station.
Was a gas test permitted at 3650 N Buckner Blvd?
Yes. Dallas issued a commercial plumbing permit for a gas test on December 10, 2025, under permit COM-PLM-25-003109.
When were permits filed for work at 3650 N Buckner Blvd?
The earliest listed filing was the electrical permit on June 4, 2025. The latest was the gas-test permit on December 10, 2025.
What work is happening near St. Philip St. Augustine - Phase 3?
The permitted work at 3650 N Buckner Blvd includes electrical service equipment replacement, a generator docking station, and a gas test. The address is listed about 310 meters from St. Philip St. Augustine - Phase 3 at 8151 Military Pkwy.
Also being built nearby
All of 75228- 3636 N Buckner BlvdApr 20, 2026Permit for installation of new paved fire lane · 7 m away
- 3625 S Buckner BlvdSep 23, 2025Checked over plugs and lights for compliance · 18 m away
- 3608 S Buckner BlvdNov 15, 2026Mcr install 10ft fence on property · 21 m away
- 3707 N Buckner BlvdJan 12, 2021Upgrade to antennas and battery cabinets · 31 m away
- 3717 S Buckner BlvdJul 16, 2025Adding a canopy for shade com-alt-add-25-000096 · 36 m away
- 8096 Norvell DrSep 11, 2025Installing new traffic signals and side walks at intersection of s buckner blvd @ jennie lee ln · 41 m away
- 8008 Norvell DrSep 14, 2020Cell tower equipment/ antenna upgrade · 126 m away
- 3530 N Buckner BlvdFeb 9, 2026Extension front metal building 44’x72’ · 166 m away
- 3516 N Buckner BlvdOct 21, 2025Install rpz on soda fountain · 175 m away
- 3510 S Buckner BlvdSep 23, 2026Interior remodel of existing space and addition of detached structure for proposed auto service center business (wheels/tires services). the new structure will have electrical and mechanical (no plumbing) · 179 m away
- 8003 Military PkwyJul 6, 2026Gas test. capped off two wall heaters and dryer service · 234 m away
- 7917 Norvell DrJul 2, 2026Installing new outlets and switches · 236 m away